My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.9 SR 07-17-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
07-17-2023
>
7.9 SR 07-17-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 8:23:23 AM
Creation date
7/12/2023 4:00:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />Cty <br />Elk - <br />River <br />To <br />Item Number <br />Mayor and City Council <br />7.9 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public HearingsJuly <br />17, 2023 <br />Zack Carlton, Community Development Director <br />Item Description <br />Reviewed by <br />Lennar's Bradford Park Subdivision— Property IDs <br />Chris Leeseberg, Senior Planner <br />Reviewed by <br />75-136-1300, 2400, 3100, 3200, 4200, & 4300 <br />a. Zone Change: R1d (Single -Family) to PUD <br />Cal Portner, City Administrator <br />(Planned Unit Development) <br />b. Conditional Use Permit: Establish a Residential <br />PUD for Bradford Park <br />c. Preliminary Plat: Bradford Park <br />Action Requested <br />Adopt, by motion, an ordinance rezoning the subject properties from R-1d (single-family residential) to Planned <br />Unit Development (PUD), subject to the condition that Council approves a PUD agreement outlining the <br />standards of the subdivision. <br />Approve, by motion, the Conditional Use Permit establishing a <br />residential Planned Unit Development (PUD), with the following <br />conditions: <br />1. A PUD Agreement shall be developed and signed by both <br />parties prior to releasing a final plat for recording. <br />CR 33 <br />2. Streets and access must comply with MN State Fire Code <br />Chapter 5 and Appendix D. <br />3. Staff approval of all site, utility, engineering, and landscaping <br />plans. - RR <br />4. Submit a phasing plan outlining the anticipated subdivision <br />additions. Hwy to <br />5. Hydrants must be spaced to ensure all portions of a residence <br />are within 250 feet of a hydrant. <br />6. All watermains shall be looped. Dead-end watermains are not <br />permitted. <br />7. The water main beneath Ivanhoe Parkway shall be continuous <br />along the entire street to the connection beneath CR 40. <br />8. The water main beneath Ivanhoe Parkway should be increased <br />from an 8" line to a 12", matching the existing pipe size in <br />Miske Meadows. Figure' <br />9. The existing lift station must remain energized throughout the entire construction process. <br />10. State and local approval of all wetland permits related to the proposed wetland fill. <br />1� <br />/69 <br />The Elk River Vision <br />A welcoming community vvith revolutionary and spirited resourcefulness, exceptional service, and p o w E A E u s r <br />community engagement that encourages and inspires prosperity ,� g /� <br />
The URL can be used to link to this page
Your browser does not support the video tag.