Laserfiche WebLink
9. The driveway access to Twin Lakes Road will be reduced to a right -in -right -out when Twin Lakes Road is <br />improved to a 4-lane divided roadway. <br />10. Future development phases will be reviewed utilizing the CUP process as outlined in city ordinances. <br />11. Improvements within city right-of-way are limited to paving, curbing, grading, and utility work. Improvements <br />such as fencing will not be permitted. <br />Approve, by motion, the Preliminary Plat of Vinje Commercial Addition with the following conditions: <br />1. Council approval of the related Land Use Amendment (LU 23-03), Zone Change (ZC 23-01) and Conditional <br />Use Permit (CU 23-06). <br />2. The preliminary plat shall be updated to include the proposed billboard within Lot 1, Block 1. <br />3. There will be no future access to Highway 10. <br />Background/Discussion <br />The applicant has submitted updated plans which remove all structures and permanent impacts from the public <br />right-of-way. The updated plans still propose establishment of a Planned Unit Development (PUD) near the <br />intersection of Twin Lakes Road and 168`h Circle NW. <br />The site is approximately 15 acres, and the concept plan includes a mini -storage facility, future commercial spaces, <br />and future light industrial and office space. These uses are generally consistent with the surrounding uses, but <br />updates to the city's Comprehensive Plan and Zoning Map are required. Some of the proposed land use and zone <br />changes associated with the city -initiated changes come under review later during this meeting conflict with the <br />current request. If approved, staff will update the final land use and zoning map to reflect the change. <br />Planning Commission and Public Hearing <br />Dan Bosshart, president of Preferred Powder Coating, noted the high standard for building materials he was held <br />to during his project review nearly 10 years ago. He requested the Commission hold this project to the same <br />standard as the Council had a long-term vision for this area, which should be maintained. No one else spoke. <br />The Commission discussed the material standards for the proposed PUD and recommended the same Business <br />Park design standards be applied to future industrial and office buildings within the PUD. The Commission also <br />made an exception for the current ministorage project. They felt that due to the current site limits and the <br />economics of a ministorage facility that application of the Business Park standards was not appropriate. Their <br />recommendation requires additional materials (brick, stone, etc.) for the proposed storage buildings, but at a level <br />below the standards required for the rest of the development. <br />With that modification to the conditions of approval for the CUP, they unanimously recommended approval of all <br />four land use applications. <br />Financial Impact <br />None <br />Mission/Policy/Goal <br />Supports the growth and development of the business community. <br />Attachments <br />■ Planning Commission Packet dated June 27, 2023 <br />■ Land Use Resolution <br />■ Zone Change Ordinance <br />