Laserfiche WebLink
Engineering <br />■ The site must meet all storm water management requirements located in the ordinance. Your <br />surveyor will be able to assist with options on these code requirements. <br />ERMU <br />Electric load sheet needs to be provided for transformer sizing and ordering, currently there are <br />long lead times for transformers. <br />Transformer location needs to be reachable from a hard surface. <br />Please let me know if you have any questions. <br />Sincerely, <br />joi�/-IOW�7 <br />Chris Leeseberg, Senior Planner <br />Ph: 763.635.1033 <br />cleesebergkElkRiverMN.gov <br />