Laserfiche WebLink
<br />Christian Commercial CUP <br />November 29,2005 <br /> <br />Page 2 <br /> <br />4. The site is large enough to require a NPDES permit and a Storm Water Pollution <br />Prevention Plan (SWPPP), however, the site has been granted a grading permit only, <br />which also requires a NPDES permit and a SWPPP. These can simply be transferred, <br />once the grading is complete, to the building contractor for continuation of the erosion <br />protection elements. <br /> <br />5. A storm water pond is proposed to be constructed near the northeast corner of the site, <br />however, most of the flow arrows on the building and parking area indicate that storm <br />water runoff will not get to the pond. More detail is necessary to indicate how the storm <br />water ponding will work on the site including drainage calculations. <br /> <br />6. A condition of approval of this proposal should be that all construction materials and <br />construction traffic enter and exit the site via the Plaisted Companies' access and not off <br />the existing TH 169 driveway. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Terry J. Maurer, PE <br />City Engineer <br /> <br />S:\PLANNlNG\Case Files\2005\CU 05-26 Christian Commercial\ll 29 05 engr's memo.doc <br />