Laserfiche WebLink
<br /> <br />Engineering <br /> The site must meet all storm water management requirements located in the ordinance. Your <br />surveyor will be able to assist with options on these code requirements. <br /> <br />ERMU <br /> Electric load sheet needs to be provided for transformer sizing and ordering, currently there are <br />long lead times for transformers. <br /> Transformer location needs to be reachable from a hard surface. <br /> <br />Please let me know if you have any questions. <br /> <br />Sincerely, <br /> Chris Leeseberg, Senior Planner <br />Ph: 763.635.1033 <br />cleeseberg@ElkRiverMN.gov