Laserfiche WebLink
Registration #: <br />Signature: <br />I hereby certify that this plan was prepared by <br />me or under my direct supervision and that I am <br />Registered Landscape Architect under the laws <br />of the State of Minnesota. <br />Drawn By: <br />Checked By: <br />Sheet Title: <br />Date: <br />Revision: <br />Project #: <br />Name:Paul Kangas <br />26017 <br />14165 James Road - Suite 200A <br />Rogers, MN 55374 <br />Phone: 612-237-8355 <br />www.insideoutsidearchitecture.com <br />Sheet Number: <br />COPYRIGHT 2023 © <br />This plan is copyrighted and shall be used <br />only for the project shown and <br />shall not be copied or reproduced without written <br />permission from Inside Outside Architecture, Inc. <br />Project Name: <br />Inside <br />OA <br />utside <br />rchitecture <br />Inc. <br />PRELI <br />M <br />I <br />N <br />A <br />R <br />Y <br />DRAW <br />I <br />N <br />G <br />S <br />NOT F <br />O <br />R <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />THE CONTRACTOR SHALL: <br />VISIT SITE PRIOR TO SUBMITTING BID TO INSPECT INSPECT THE SITE <br />AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE <br />SCOPE OF WORK. <br />VERIFY THE LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE <br />ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES THAT <br />WOULD COMPROMISE THE DESIGN OR INTENT OF THE PROJECT <br />LAYOUT. <br />ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS <br />GOVERNING THE WORK OR MATERIALS SUPPLIED. <br />PROTECT ALL EXISTING FEATURES FROM DAMAGE DURING PLANTING <br />OPERATIONS. ANY DAMAGE SHALL BE REPAIRED OR REPLACED AT NO <br />COST TO THE OWNER. <br />CALL GOPHER-ONE TO VERIFY ALIGNMENT AND LOCATION OF ALL <br />UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE <br />PROTECTION FOR SAME BEFORE CONSTRUCTION BEGINS. <br />ESTABLISH TO THEIR SATISFACTION THAT SOIL AND COMPACTION <br />CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT <br />AND AROUND THE BUILDING SITE. <br />UTILITIES, BACKGROUND INFORMATION, AND LAYOUT: <br />ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO <br />NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO <br />REMAIN. ADEQUATELY COMPACT ANY EXCAVATED AREAS TO AVOID <br />FUTURE SETTLEMENT. <br />EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER <br />EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO <br />LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL NOTIFY THE <br />LANDSCAPE ARCHITECT OF DISCREPANCIES THAT WOULD <br />COMPROMISE THE DESIGN INTENT PRIOR TO BEGINNING <br />CONSTRUCTION. <br />THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS <br />AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED <br />TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO <br />MINIMIZE TREE REMOVAL AND GRADING. ANY CHANGE IN ALIGNMENT <br />MUST BE APPROVED BY LANDSCAPE ARCHITECT. <br />LANDSCAPE INSTALLATION AND PHASING: <br />COORDINATE THE LANDSCAPING AND PLANTING INSTALLATION WITH <br />OTHER CONTRACTORS WORKING ON SITE. <br />NO PLANTINGS SHALL BE INSTALLED UNTIL GRADING AND <br />CONSTRUCTION HAS BEEN COMPLETED IN THE PLANTING AREAS. <br />PLANT MATERIALS: <br />ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE <br />NURSERY STOCK STANDARDS AS PUBLISHED BY THE AMERICAN <br />NURSERY AND LANDSCAPE ASSOCIATION (ANLA). <br />PLANTS SHALL NOT BE STOCKPILED ON SITE ANY LONGER THAN <br />NECESSARY AND SHALL HAVE ADEQUATE WATERING AT ALL TIMES <br />PRIOR TO PLANTING. PLANTS THAT SHOW OBVIOUS SIGNS OF <br />DISTRESS FROM HEAT, OR LACK OF WATER, SHALL NOT BE INSTALLED. <br />ROOT BALLS FOR ALL TREES SHALL BE COVERED WITH MULCH WHILE <br />AWAITING PLANTING. <br />UNLESS NOTED OTHERWISE, DECIDUOUS SHRUBS SHALL HAVE AT <br />LEAST 5 CANES AT THE SPECIFIED SHRUB HEIGHT. ORNAMENTAL <br />TREES SHALL HAVE NO 'V' CROTCHES AND SHALL BEGIN BRANCHING NO <br />LOWER THAN 3' ABOVE THE ROOT FLARE. STREET AND BOULEVARD <br />TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE THE ROOT <br />FLARE. <br />ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE <br />SALES SHALL NOT BE USED. ALL CONIFEROUS TREES SHALL HAVE A <br />FULL, NATURAL FORM CONSISTENT WITH THE SPECIES. <br />THE LANDSCAPE PLAN TAKES PRECEDENCE OVER THE PLANT <br />SCHEDULE IF ANY DISCREPANCIES IN QUANTITIES EXIST. <br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. <br />ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN <br />ON PLAN. LANDSCAPE ARCHITECT MUST APPROVE ALL STAKING PRIOR <br />TO ANY DIGGING. <br />NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS <br />APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT PRIOR TO <br />THE SUBMISSION OF A BID AND/OR QUOTATION. <br />ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS ARE <br />OCCASIONALLY NEEDED IN THE FIELD. SHOULD AN ADJUSTMENT BE <br />REQUIRED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED IN <br />ADVANCE TO DISCUSS AN ACCEPTABLE MODIFICATION.. <br />ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH <br />DRIED BONE MEAL, OTHER APPROVED FERTILIZER MIXED IN WITH THE <br />PLANTING SOIL PER THE MANUFACTURER'S INSTRUCTIONS OR MAY BE <br />TREATED FOR SUMMER AND FALL INSTALLATION WITH AN APPLICATION <br />OF GRANULAR 0-20-20 OF 12 OZ PER 2.5" CALIPER PER TREE AND 6 OZ <br />PER SHRUB WITH AN ADDITIONAL APPLICATION OF 10-10-10 THE <br />FOLLOWING SPRING IN THE TREE SAUCER. <br />ALL PLANTING AREAS RECEIVING GROUND COVER, PERENNIALS, <br />ANNUALS, AND/OR VINES SHALL RECEIVE A MINIMUM OF 8" DEPTH OF <br />PLANTING SOIL CONSISTING OF AT LEAST 45 PARTS TOPSOIL, 45 PARTS <br />PEA/COMPOST AND 10 PARTS SAND. <br />ALL PLANTS SHALL BE INSTALLED PER THE PLANTING DETAILS. <br />WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER <br />IN CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY, <br />WATERPROOF CREPE PAPER MANUFACTURED FOR TTHEIR PURPOSE. <br />WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND <br />REMOVE ALL WRAPPING AFTER 5-1. <br />IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY <br />DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY <br />OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT <br />ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE <br />DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br />PRIOR TO PROCUREMENT AND/OR INSTALLATION. <br />EDGING AND MAINTENANCE STRIPS: <br />BLACK POWDER COATED STEEL EDGER TO BE USED TO CONTAIN <br />SHRUBS, PERENNIALS, AND ANNUALS WHERE BED MEETS SOD/SEED <br />UNLESS NOTED OTHERWISE. <br />MAINTENANCE STRIPS SHALL HAVE EDGER AND MULCH AS SPECIFIED <br />OR AS INDICATED ON DRAWINGS. <br />MULCHING: <br />ROCK MULCH OR COBBLE SHALL BE CLEAN AND FREE OF ANY <br />SIGNIFICANT DIRT, SOIL, OR ORGANIC MATTER THAT WILL PROMOTE <br />WEED GROWTH. HIGH QUALITY GEOTEXTILE FABRIC, WITH EDGES <br />OVERLAPPED AT LEAST 12", SHALL BE PLACED UNDER ALL ROCK <br />MULCH. <br />ALL SHRUB BED MASSES SHALL RECEIVE 3" COMPACTED DEPTH LAYER <br />OF BROWN SHREDDED WOOD MULCH WITH A UNIFORM TREATMENT OF <br />PRE-EMERGENT HERBICIDE (PREEN OR EQUAL) APPLIED PRIOR TO <br />MULCHING. <br />ALL PERENNIAL PLANTING BEDS SHALL RECEIVE 3" COMPACTED DEPTH <br />LAYER OF BROWN SHREDDED WOOD MULCH WITH A UNIFORM <br />TREATMENT OF PRE-EMERGENT HERBICIDE (PREEN OR EQUAL) <br />APPLIED PRIOR TO MULCHING. <br />ALL TREES SHALL HAVE A MULCH RING (MINIMUM 48" DIAMETER) OF 4" <br />DEEP SHREDDED HARDWOOD MULCH WITH NONE IN DIRECT CONTACT <br />WITH TREE TRUNK. <br />SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER <br />MANUFACTURER'S RECOMMENDED RATES UNDER ALL MULCHED AREAS <br />INCLUDING TREE MULCH RINGS. <br />IRRIGATION: <br />VERIFY EXISTING/PROPOSED IRRIGATION SYSTEM LAYOUT AND <br />CONFIRM LIMITS OF IRRIGATION PRIOR TO SUPPLYING SHOP <br />DRAWINGS. <br />UNLESS SPECIFICALLY NOTED OTHERWISE, THE LANDSCAPE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN IRRIGATION <br />LAYOUT PLAN AND SHOP DRAWING AS A PART OF THE SCOPE OF WORK <br />WHEN BIDDING. THE IRRIGATION SHOP DRAWINGS SHALL BE <br />REVIEWED BY THE LANDSCAPE ARCHITECT PRIOR TO ORDERING <br />MATERIALS OR INSTALLATION. <br />THE LANDSCAPE CONTRACTOR SHALL INSURE THAT ALL <br />SODDED/SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, <br />INCLUDING THOSE AREAS DIRECTLY AROUND AND ABUTTING BUILDING <br />FOUNDATION. <br />TURF OR OTHER SEEDED AREAS SHALL BE ON DIFFERENT ZONES THAN <br />PLANTING BEDS IN ORDER TO CONTROL WATER FLOW TO DIFFERING <br />PLANT SPECIES. <br />IRRIGATION TRENCHES SHALL BE ADEQUATELY COMPACTED TO AVOID <br />SETTLEMENT IN THE FUTURE. <br />THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A <br />WATERING/LAWN IRRIGATION SCHEDULE APPROPRIATE TO THE <br />PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH <br />REQUIREMENTS. <br />SEEDING AND SODDING: <br />SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE <br />AREAS NOTED TO RECEIVE SOD. SEED SHALL BE INSTALLED AND <br />MULCHED PER MNDOT SPECS UNLESS OTHERWISE NOTED. <br />ALL SEEDED AREAS WITH SLOPES STEEPER THAN 4:1 SHALL HAVE <br />STRAW MAT, OR OTHER SUITABLE EROSION CONTROL METHODS, IN <br />PLACE IMMEDIATELY AFTER SEEDING. <br />WHERE SOD OR SEED ABUTS A PAVED SURFACE, FINISHED GRADE <br />SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, <br />ETC. <br />SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE <br />STAGGERED JOINTS. SOD MUST BE STAKED WITH WOOD LATH OR <br />METAL STAKES ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE <br />SWALES. <br />CALENDAR OR CLIMATIC RESTRICTIONS: <br />THE PREFERRED SODDING WINDOW IS FROM AUGUST 15th - OCTOBER <br />15th. HOWEVER, SOD MAY BE INSTALLED AT ANY TIME PROVIDED <br />ADEQUATE IRRIGATION COVERAGE IS AVAILABLE. IF NO IRRIGATION IS <br />AVAILABLE, THE CONTRACTOR IS RESPONSIBLE FOR SUPPLEMENTAL <br />WATERING AS NEEDED FOR SOD ESTABLISHMENT. <br />THE PREFERRED FALL SEEDING WINDOW, FOR SITES WITHOUT <br />IRRIGATION, IS FROM AUGUST 15th - SEPTEMBER 15th. <br />DORMANT SEEDING MAY OCCUR AFTER SOIL TEMPERATURES ARE <br />CONSISTENTLY BELOW 45 DEGREES AND SHOULD GENERALLY NOT <br />OCCUR PRIOR TO NOVEMBER 1st. <br />LANDSCAPE PLANTING SHOULD GENERALLY OCCUR FROM MAY 1st - <br />JUNE 15th OR FROM SEPTEMBER 1st - OCTOBER 15th. PLANTING <br />OUTSIDE THESE DATES IS NOT RECOMMENDED, BUT CAN OCCUR WITH <br />PROPER CARE OF NURSERY STOCK ON SITE AND WITH AMPLE <br />WATERING. <br />PLANTING SHALL NOT OCCUR IF TEMPERATURES ARE HIGHER THAN 85 <br />F. DEGREES, OR IF WINDS EXCEED 15 MPH DURING PLANTING <br />OPERATIONS. <br />PROTECT ALL EXISTING OAKS ON SITE SCHEDULED TO REMAIN. IF <br />EXISTING OAKS ARE DAMAGED IN ANY MANOR, ABOVE OR BELOW <br />GROUND IN THE ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT <br />SHOULD BE APPLIED IMMEDIATELY AFTER WOUNDING. OAKS ARE NOT <br />TO BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN APRIL 15th <br />AND JULY 1st. <br />OWNER ACCEPTANCE AND WARRANTY REQUIREMENTS <br />THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR OWNER <br />ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE <br />IMPROVEMENTS. <br />THE CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF <br />ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER <br />ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY <br />OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY <br />OF THE CONTRACTOR. <br />THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE <br />PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, <br />FERTILIZATION AND DISEASE/PEST CONTROL. <br />AT A MINIMUM, THE CONTRACTOR SHALL GUARANTEE NEW PLANT <br />MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER <br />ACCEPTANCE. THE WARRANTY (INCLUDINGT AT LEAST ONE FULL <br />GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE <br />DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE <br />COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. PARTIAL <br />ACCEPTANCE WILL NOT BE CONSIDERED. <br />REPRODUCIBLE AS-BUILT DRAWING(S) OF ALL LANDSCAPE <br />INSTALLATION AND SITE IMPROVEMENTS UPON COMPLETION OF <br />CONSTRUCTION INSTALLATION AND PRIOR TO PROJECT ACCEPTANCE. <br />PLANTING NOTES: <br />FORCE <br />STORAGE <br />Elk River, Minnesota <br />- <br />6-20-2023 <br />-- <br />-- <br />PK <br />PK <br />PLANTING NOTES <br />& DETAILS <br />L1-2 <br />UNDISTURBED NATIVE SOIL <br />SAFETY FLAGGING IF STAKING IS USED <br />TREE WRAP TO FIRST BRANCH <br />SCARIFY BOTTOM AND SIDES OF HOLE <br />MUST BE MAINTAIN PLUMB THOUGH THE WARRANTY <br />IS AT THE CONTRACTOR'S DISCRETION. THE TREE <br />AFTER PLANTING. STAKING IS SUGGESTED, BUT <br />TREES SHALL BE PLUMB IN BOTH DIRECTIONS <br />DECIDUOUS TREE PLANTING DETAIL <br />SCALE: 1/2" = 1'-0" <br />LANDSCAPE ARCHITECT IF POOR DRAINAGE <br />RATES PRIOR TO PLANTING AND NOTIFY <br />CONTRACTOR SHALL FIELD TEST PERCOLATION <br />PERIOD AND CONFORM WITH A.N.A. GUIDELINES FOR <br />STANDARD LANDSCAPE PRACTICES <br />IS SUSPECTED <br />REMOVE ALL FLAGGING AND LABELING <br />COMPACT MORE THAN NEEDED TO MAINTAIN <br />SATURATE SOIL WITH WATER. DO NOT <br />INSTALL BACKFILL IN 8-12" DEEP LAYERS & <br />AND DISPOSE FROM SITE <br />PRUNE ANY DAMAGED OR CROSSING BRANCHES <br />PLUMB <br />2 x ROOT BALL WIDTH <br />4" DEEP MULCH - NO MULCH IN DIRECT <br />CUT BACK WIRE BASKET AND REMOVE <br />CONTACT WITH TRUNK <br />VERIFY ROOT FLARE ELEVATION AND PLACE <br />AT OR JUST ABOVE SURROUNDING GRADE. <br />BURLAP FROM TOP OF BALL <br />LOAM PLANTING SOIL <br />BACKFILL SHALL FORM WATERING RING AT OUTER <br />EDGE AND BE FILLED WITH WATER AT TIME OF <br />INITIAL PLANTING PRIOR TO MULCHING <br />4 <br />L1-2 <br />PLANTING DETAILS: <br />UNDISTURBED NATIVE SOIL <br />SCARIFY BOTTOM AND SIDES OF HOLE <br />MUST BE MAINTAIN PLUMB THOUGH THE WARRANTY <br />IS AT THE CONTRACTOR'S DISCRETION. THE TREE <br />AFTER PLANTING. STAKING IS SUGGESTED, BUT <br />TREES SHALL BE PLUMB IN BOTH DIRECTIONS <br />CONIFEROUS TREE PLANTING DETAIL <br />SCALE: 1/2" = 1'-0" <br />LANDSCAPE ARCHITECT IF POOR DRAINAGE <br />RATES PRIOR TO PLANTING AND NOTIFY <br />CONTRACTOR SHALL FIELD TEST PERCOLATION <br />PERIOD AND CONFORM WITH A.N.A. GUIDELINES FOR <br />STANDARD LANDSCAPE PRACTICES <br />IS SUSPECTED <br />REMOVE ALL FLAGGING AND LABELING <br />COMPACT MORE THAN NEEDED TO MAINTAIN <br />SATURATE SOIL WITH WATER. DO NOT <br />INSTALL BACKFILL IN 8-12" DEEP LAYERS & <br />AND DISPOSE FROM SITE <br />PRUNE ANY DAMAGED OR CROSSING BRANCHES <br />PLUMB <br />2 x ROOT BALL WIDTH <br />4" DEEP MULCH - NO MULCH IN DIRECT <br />CUT BACK WIRE BASKET AND REMOVE <br />CONTACT WITH TRUNK <br />VERIFY ROOT FLARE ELEVATION AND PLACE <br />AT OR JUST ABOVE SURROUNDING GRADE. <br />BURLAP FROM TOP OF BALL <br />LOAM PLANTING SOIL <br />BACKFILL SHALL FORM WATERING RING AT OUTER <br />EDGE AND BE FILLED WITH WATER AT TIME OF <br />INITIAL PLANTING PRIOR TO MULCHING <br />NATURAL FORMS OTHER THAN LIMITED PRUNING FOR <br />FOR THIS PROJECT. TREE SPECIMENS SHOULD HAVE <br />CHRISTMAS TREE PRODUCTION CANNOT BE USED <br />CONIFEROUS TREES GROWN FOR COMMERCIAL <br />HEALTHY GROWTH AND PLANT STRUCTURE. <br />5 <br />L1-2 <br />O.C. PLANT SPACING <br />P =R =AREA PER PLANT IN SF = <br />12"10.5"0.87 SF <br />15"12.7"1.35 SF <br />18"15.6"1.95 SF <br />24"20.8"3.46 SF <br />P = TYPICAL PLANT SPACING - SEE PLANT SCHEDULE <br />R = PLANT ROW ASSUMING TRIANGULAR SPACING <br />NUMBER OF PLANTS = TOTAL AREA/AREA PER PLANT <br />PERENNIAL SPACING GUIDELINES <br />SCALE: 3/4" = 1'-0" <br />PR AREA PER PLANT <br />CENTER OF PLANTR <br />P2 <br />L1-2 <br />PERENNIAL PLANTING <br />SCALE: 3/4" = 1'-0" <br />LOOSEN ROOTS OF <br />PLANT MATERIAL PRIOR <br />MULCH - 3" DEPTH <br />EDGER - SEE SPECS. <br />12" DEPTH (MIN.) LOAM <br />PLANTING SOIL <br />VARIES <br />SEE PLAN <br />TO PLANTING <br />EDGE VARIES - SEE PLAN <br />3 <br />L1-2 <br />SHRUBS PLACED SO THAT TOP <br />MULCH - 3" DEEP - SEE SPEC <br />LANDSCAPE FABRIC - SEE SPEC. <br />PLANTING SOIL - SEE SPEC. <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING <br />LOOSEN ROOTS OF ALL <br />CONTAINERIZED PLANTS. <br />EDGE VARIES - REFER TO PLAN <br />REFER TO PLAN <br />18" MIN. <br />SCALE: 3/4" = 1'-0" <br />SHRUB PLANTING DETAIL <br />EDGING MATERIAL - SEE SPEC. <br />BUILDING WALL (TYP) <br />OF CONTAINER SITS FLUSH <br />WITH PROPOSED GRADE. <br />1 <br />L1-2