My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5a ERMUSR 06-13-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
06-13-2023
>
2.5a ERMUSR 06-13-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:25:43 PM
Creation date
6/13/2023 1:21:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 58FE3CF5-7330-4F18-9C60-B177A84C616D <br />AMI System Master Agreement <br />This AMI System Master Agreement ("Agreement") is effective December 31st, 2022 <br />("Effective Date") by and between Elk River Municipal Utilities, a Minnesota municipal <br />corporation, ("ERMU") whose principal office is located at 13069 Orono Parkway Elk River, <br />MN 55330, and Core & Main LP, whose principal office is located at 1830 Craig Park Court, St. <br />Louis, MO 63146 ("Distributor") (individually referred to as "Party" or collectively as <br />"Parties"). <br />1. Recitals <br />1.1. ERMU is a municipal corporation that serves about 13,600 electric and about 5,500 water <br />accounts within a service territory covering approximately 50 square miles. <br />1.2. Distributor is a Florida limited partnership engaged in the sale, installation, and support <br />of the SENSUS FlexNet® Advanced Metering Infrastructure (hereinafter referred to as "AMI <br />System"); and <br />1.3. ERMU desires to purchase from Distributor, and Distributor desires to provide to ERMU, <br />the AMI System and associated maintenance services for the AMI System according to this <br />Agreement. <br />For and in consideration of the foregoing recitals and the mutual promises, terms, conditions, and <br />warranties set forth herein, ERMU and Distributor hereby agree as follows: <br />2. Definitions <br />The following terms, when capitalized in this Agreement, shall mean as follows: <br />"Agreement" means this AMI System Master Agreement by and between ERMU and <br />Distributor, including all documents and exhibits attached hereto and incorporated herein by <br />reference. <br />"Active Meters" means an installed Sensus FlexNet meter (with a SmartPoint Module installed) <br />or a Sensus SmartPoint Module which has been installed on a third party meter, and which, in <br />either case, is not an Unavailable Meter (or on an Unavailable Meter in the case of SmartPoint <br />Modules on third party meters) and which satisfies all of the following criteria: (i) it functions <br />properly, is powered and is not a damaged or failed meter; (ii) it is in a deployment area of <br />meters for Customer such that a sufficient number of two-way meters are in range of each other; <br />(iii) it is serviced by RF Field Equipment that has not been subjected to a power failure greater <br />than eight (8) total hours; (iv) neither it nor the RF Field Equipment that serves that meter has <br />been affected by a Force Majeure event; (v) jamming of the radio spectrum is not preventing or <br />interfering with radio communication to or from the meter; (vi) it is installed in the Service <br />Territory; (vii) it has not been reported to Customer under Sensus' or Customer's preventative <br />maintenance; (viii) its functioning or performance has not been adversely affected by a failure of <br />Customer to perform its obligations or tasks for which it is responsible under this Agreement, <br />including, but not limited to, testing and confirming that the socket to which the meter will be/is <br />connected is in safe operating condition, is fully functional, is not corroded, does not contain <br />improperly installed jaws or other deficiencies, complies with ANSI standards, and is not hot, <br />damaged, or otherwise in need of maintenance or repair; (ix) its functioning or performance has <br />Elk River Municipal Utilities 3 Core & Main LP <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.