My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5a ERMUSR 05-09-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
05-09-2023
>
5.5a ERMUSR 05-09-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:28:36 PM
Creation date
6/6/2023 4:18:40 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VP <br />CONSTRUCTION <br />To : Elk River Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />830 Boone Avenue <br />Golden Valley, MN 55427 <br />P: 952-837-8600 <br />www.rjmconstruction.com <br />CHANGE ORDER REQUEST <br />PCO: Owner-24 <br />From: Justin Rice <br />PH: <br />Email: justin.rice@rjmconstruction.com <br />Description: PR-013 -Revised storm water treatment Date: 02/24/2022 <br />locations Project: Elk River Municipal Utilities - Field Services Fz <br />Details: <br />Revised locations of stormwater treatment units as a result of modifying CDS-101. <br />Item <br />Subcontractor: <br />Phase: <br />1 <br />Kevitt Excavating, LLC <br />33-01-05-Site Water Distribution Pipinc <br />70,711.00 <br />Added scope of work related to storm sewer system changes. <br />This scope of work will be paid on a time and materials basis. <br />2 <br />Great Northern Landscapes, Inc <br />32-90-05-Landscaping <br />100.00 <br />Added irrigation sleeve. <br />3 <br />North Country Concrete, Inc <br />32-13-05-Site Concrete <br />3,535.00 <br />Added concrete steps and sidewalk. <br />4 <br />Briese Iron Works <br />05-50-05-Metal Fabrications <br />2,950.00 <br />Added powder coated handrail. <br />5 <br />Nord Excavating, Inc <br />31-22-05-Earthwork <br />2,840.00 <br />Additional removals and grading for new stairs. <br />Subtotal: <br />80,136.00 <br />General Liability <br />809.37 <br />Builders Risk <br />236.41 <br />Bond <br />715.21 <br />SDI -1.25% <br />1,001.71 <br />Contractor's Fee <br />1,243.48 <br />4,006.18 <br />Total For Change Order: <br />84,142.18 <br />Architect: <br />Approved Elk River Municipal Utilities Submitted RJM Construction, LLC <br />By: By: <br />Signed: <br />Signed: Signed: <br />Date: <br />Date: Date: <br />Page 1 of 1 <br />20520-0154 <br />115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.