My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 ERMUSR 05-09-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
05-09-2023
>
5.5 ERMUSR 05-09-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:28:15 PM
Creation date
6/6/2023 4:14:36 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Kerzman — Engineering Manager <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />May 9, 2023 <br />5.5 <br />SUBJECT: <br />Field Services Facility Expansion Project Change Order <br />ACTION REQUESTED: <br />Authorize approval of Change Order no. 7 <br />DISCUSSION: <br />The attached change order is for stormwater system revisions needed due to contaminated <br />soils found at the south portion of the site. This change order was tracked as labor and <br />materials with the site utilities contractor. Three sump pumps were installed at upstream <br />structures to avoid installation into contaminated soil. <br />Staff continues to work with RJM Construction on closeout items for the project, and RJM is <br />mobilizing crews to finish sitework. If the weather cooperates, they are looking to have the <br />remaining sitework done by early June. <br />ACTION REQUESTED: <br />Authorize the approval of the attached Change Order no. 7 <br />ATTACHMENTS: <br />• Change Order Request no. 7 for Stormwater Revisions <br />Page IofI <br />114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.