Laserfiche WebLink
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Kerzman — Engineering Manager <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />May 9, 2023 <br />5.5 <br />SUBJECT: <br />Field Services Facility Expansion Project Change Order <br />ACTION REQUESTED: <br />Authorize approval of Change Order no. 7 <br />DISCUSSION: <br />The attached change order is for stormwater system revisions needed due to contaminated <br />soils found at the south portion of the site. This change order was tracked as labor and <br />materials with the site utilities contractor. Three sump pumps were installed at upstream <br />structures to avoid installation into contaminated soil. <br />Staff continues to work with RJM Construction on closeout items for the project, and RJM is <br />mobilizing crews to finish sitework. If the weather cooperates, they are looking to have the <br />remaining sitework done by early June. <br />ACTION REQUESTED: <br />Authorize the approval of the attached Change Order no. 7 <br />ATTACHMENTS: <br />• Change Order Request no. 7 for Stormwater Revisions <br />Page IofI <br />114 <br />