My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. PCSR 04-25-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2023
>
04-25-2023
>
8.1. PCSR 04-25-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2023 2:53:38 PM
Creation date
4/20/2023 2:51:51 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with the proposed development, Sherburne County Public Works reserves the right to make <br />an intersection modification to a Right-in Right-out configuration in the future. We approve <br />the westerly intersection location as shown on the provided schematic. Dave Roedel, <br />Sherburne County Deputy Engineer <br />• The threshold for turn lane requirements is 10 or more lots for a right turn lane and 20 or <br />more lots for a left turn lane. With the number of lots at each proposed intersection, a right <br />turn lane and left turn lane will be required to be constructed on CSAH 33 at both <br />intersection locations at the developer’s expense. A Permit will be required to be taken out <br />from the Public Works Department to ensure construction is per County standards. Dave <br />Roedel, Sherburne County Deputy Engineer <br />Please let me know if you have any questions. <br /> <br />Sincerely, <br /> Zack Carlton, Community Development Director <br />Ph: 763.635.1035 <br />zcarlton@ElkRiverMN.gov
The URL can be used to link to this page
Your browser does not support the video tag.