My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 SR 04-17-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
04-17-2023
>
7.1 SR 04-17-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:34:55 AM
Creation date
4/14/2023 9:00:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) <br />GENERAL <br />TIE <br />EUMwnnoN SYs`<EMHiNPoe`si ENACTED RY THE EPa iN 'IIP;EMeEe`;9es AN ;Ht sO,B MPCA PI I ERMIT II IN TO I ATERI, MPLIANCE WITH THE NATIONAL POL DII FCIRSA <br />R <br />TOE ACTOR 11 REIP.NEI.LE ION <br />NTRICT <br />THE PLRIMPLEMENT— PROVIDE RUCTURAL CONTROS AND/oR CORPO ZPP AD IED El TOE L CORPORATION PRACT EE DEIGNED ANSTRUCTURAL G MNIMIIE POLLGTANTI N THE STORM WATER OACTARGE <br />PROJECT DESCRIPTION <br />TIE "LL"N' <br />ARE <br />TIE EATON <br />ON A OF <br />SPECIFIC TI. NAEM ENTSIA GNG AND PERMANEN 'I" <br />"I'A IN <br />N ACCORDANCE III TIE IT (PART I CI) AN <br />IRS IN I NNE 'TRUCTION UNTIL THE CONSTRICTION PROJECT IS COMPLETE. THE ENTIRE ITE HAE GNDERGONE FINAL STABILIZATION. AND A N.DT (PRICE of <br />ERMNATION]N HAS BEEN MOR. FED TO THE MPCA <br />RAKING REGGIR ITT TO ERMIT (PART 21 2), THE CONTRACTOR SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIER IN THIS PART HAVE BEEN TRAINED IN ACGORBANCE SLO THIS PERMITS <br />UAL('I) oVERSESNG IMPLEMENTATION OP REVIING. AND AMENDING THE SAPFP AND INDITDIAL(S) PERFORMING INSPECTIONS AS REOVIRED N PART ISE. ONE of THESE NDIVIDUAL(S) <br />.III RE ASIA <br />B. INDIVIDUAL(S)EPERFORMING GR SUPERVISNG THE INI,ALLATION. MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL IN A PROJECT MUIT BE TRAINED IN THESE OCR DUTIESIN ACC IRM PIE 'To TOE . <br />IT (PART s.101. TR WITH <br />TOE <br />GNTATC, <br />OALL <br />'NCTME <br />TOE TRAINING 11 IECHINED IN OR SLO IF <br />E�O <br />PERSONNEL TOP TOE P1111IT IIIE BEEN DETERMINED <br />ENioRTOE asiPNATOE, ,.- <br />P'EVENTAN 'EDMENT CONTROL RE .ANEN I STORM IATEI M=N`NLNGALEE MINNEI.TA CREEP CDNITIICTION 5TENIMIATEI PERMIT <br />AND CONSTRUC,ION CINITIll IPEGFICATIDNS FOR T AP IFTHIS PRGLEAT NLL SFACA' ON AND TIEII CILLY ADDRESSMPCA THE RESPLEASTDNIIB PEI OFPOOR THE OWNER AND THCRIMMENCEMENTE CONTRACTOR REGARDING THE 'IE THE <br />N ACCORDANCE WTO TOE MITP(pFART „.„RpALENIPECTIONI AND MAINTENANCE CONDUCTED DURING CONSTRGCTIDN MUST E RFCORDEB WITHIN CA `T"'DN.WRITING AND THESE RECGRDE <br />MOST <br />WITHIN TVEN iTTo TOE CALENDAR DAYS. D ANC NTH PERT II E ANY A,FNDMFNTA TO THE ST,PPP PROPOSED AI REI L, OF THE IN PECTDN MUST BE D CUMENT D A REOU RED RDA <br />A RECORD RETENTION <br />IT (PARTILEGTH PP �oNPER°LToNA`C IES) N DIN , ALL CHANCES TO IT, AND INIPEITIONI AND MAINTENANIE RECORDS MIST BE IEPF AT THE SHE <br />EllUS I.NITIIIT ON N, DURING NGRMAL WTOI IO HOURS. O RAIRTAF I L CDN OL DF T T PORTION OF TOE ITE. TOE WSPPP CAN BE BEPT IN EITHER TOE FIELD OFFICE OR IN AN ON -ATE <br />VENALILABLE To N ACCORDANCEFEDER'ToAL TOESTATE. PEMSAND LOCAL o�'FIOALs wI.HwC71 ROURA UPOMHST N REouEA FOR THE DURA,IGN of TRF M DOES NOT INCLUDE ANY REc0RER NIDRMA Ds AFTER SUBMIIRED TTAL of THE Nc <br />ED POL STE SLOPES HAVE BE EN <br />'TAIL IED AND TOEN TOE I STAFF RE CLEANED TER TOE A INTENDED ISE I ADD TIN TI TO I I SIT BE NSTALLE I I, TRAP <br />SEDIMENT N ACCORDANCE WHO TOE PRIFUL <br />CHLDANGE N MIT (PART "I) THE L.INTIACT"'HALL II'HA"E THE I NAR SEDIMENT -LADEN WATERS RELATED ,o Dewnrerewc ore RAIN EDRAwwc (E.G.. PUMPED DIsmARGE <br />/DITc AIDE) NIMANO THE SURFACE WATER, IT MUST BE TRE41ED WITH THE APPROPRIATE SEES. SUCH THAT THE DISCHARGE DOES NOT ADVERSELI AFFECT THE RECEIGING <br />WATER ON D.WNITREAM PEITEI <br />T THE CONTRACTOI MUST DIITTARGE WATER THAT CONTANC GIL OR GREASE, TIE CONTRACTOR MOLL ISE AN OIL -WATER SEPARATOR OR -TABLE FILTRATION DEVICE BE.I CARTRIDGE BOEIN <br />MATERIALS MUST ACHIEVE APPRotIMATELY DO PERCENT GRGGND COVERAGE (TYPICALLY 2 TONS/ACRE} <br />'IT <br />ENCE AN <br />I OF <br />III I <br />IN I <br />CONLPOLA <br />TOEMWATERACONVEYANCESNSUCH AS CURB AND GUTTER SYSTEMS oR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER IN ACCORDANCE <br />THE IONTRACTOR ITALL INSTALL ENERGY DISSPAUFN MATERIAL HE RIP RAP ON ERGIION CONTRGL BLANUET) AT ALL N,RB GUT oPENNVI Nww IS HOGRI of 111. INSTALLATION. <br />IT (PART HE) <br />. , GN II DENUDED iN PART x,.x) SIT ROUTINELI INSPECT THE EN <br />eNRpAoAYS DUFpI c T GREATER THANo. NCHEs N 24 HOURS FoLLo'NG AN IN PE N <br />FIAT THIN AA HOGR 'FALL EVENT. THE NETT INIPECTION MUST BE IONDUCTED III N NEuu SENT DAYS ALTER THE RANFALL EVENT. THE INSPECTIONS MUST BEEPC EF THE END 01 THE RE 'I ELS N�LSISIDNAIF INIPEAT SCAVE PEELER T'NDIGNI ALLOW ACIDIC INLEIS ANOTHER TIME IIAME IS DIENDED AEL THE I.NTIVCTCI RIIT <br />ALL IRIMETEI IINTIlL DEEHIE I MOST BE REPAREA RE 'FACED " "'PLEMENTED SO IN THE' REGIME NN"N'T 'NAL " 'HE IRS ME NT 'EACTEI INE HALT (11) of THE HEIGHT of THE <br />DEVICE THESE EPA I MIST E I MADE DO I HE END 0, THE NEIT AISNESC IAI AITE I DGOVER, OR THEIEAI L El A A IMPHN AS FELD OONDTFN, ALF_ ACCESS <br />SSI THE RISC <br />IS CVREACHES ONE-HALF (1/1) THE STORAGE vOILME. <br />CATCH BA <br />(T) DA <br />AN (TJE CH'ALA "Ell RIN TOLOI <br />RESPONSIBLE <br />FOR CONTACTING ALL LOCAL. RELYGNAL. STATE AND FEDERREMOVALAL AUANDTHGRITIES AND RECEVNG ANY APPLICABLE IIAILIATIN MCI' TRIP I FACE NOR EN <br />... MTV P"' I' CONDUCT` AN' *111 1 1111AIE SAIN `AEFITED III EVIDENIE IT EII-ITE SERIMENT TRACIING INTI DAVID CIIIAIEC TIAIIED IEDIPENT MIST BE REMOVED FIRM ALL <br />PAVED 11 "ACE' BOTH ON AND 0" ATE "THIN " HOURS AT D"O"" <br />A TIE ETA AND EITHER AIEAA ADIACENT TO THE PI.ECT MOST BE <br />SEDMENT <br />PEENT <br />INIMPE OILDOEIMPACTS (EEG., NGnIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM AWERI BY THE NEaT RAN AND/oR POSE A <br />MANNERANDM SAFETY HAZARD TO USERS OF PUBLIC STREETS)THE CONTRACTOR AND THE 0 'NEI ARE TIN 'I' I I "' ED TI 1 10 'HE MPCA AND THE ITATE A NOTIRE AT TERMINAL- AFTER ATE HAI BEEN ITABILIFEA OONIFI1OFIAN HAS ENDED <br />RV (SINGL,IF TES)GTO NlIEEIIEITNEAT NG <br />CHEMCALI MAI GULF BE APPLIED WHERE TREATED IFOIMSATEI IS DINEILED TO A SEDIMENT OONTREFL AIITEM SPHOULL ALLOWS 1.1 IlLTIATRFN 01 SETTLEMENT 01 THE ILOI PIIOI TO <br />D5CHARGE TO STRIACE "'T N CAL' MIST BE SELECTED THAT A ATE I' AN I I AS I I X A DUN A CFO <br />ENA NO RACTIERI AND WITH DOING 11PITIATIONI AND SEDIMENT REMOVAL DEIGN SPESTIATIONI PROVIDED IT THE MANUFACTURER OR IlIlDER/SDUPPLI R OF THE APIDIADLE ED <br />COVERPRODUCTS OR WASTES WHICH AN I No Do OF CON AM N I RM ME I To E HARD A, NOT EL P BE 6" E M ENT, <br />A N ACCORDANCE OFF THE PERMIT, 11ILDINA PRGDllLI THAT HAVE THE POTENTIAL TO LE4GH POLLILANTI MIST BE INDEI HE TIC SHEETING OR TEMPORARY LOOPS( To <br />S ER COVER HEAT. PLASTIC <br />OFJ TV PRESENT THE DISCHARGE AT EERoR PROTECTED A' SIMILAILI EIIED MEAND DEAWNED TO MINIMIZE CONTACT WITH ITRIMSEELEI <br />PIE _=ANOEADIDT�HVT <br />CA 'FEN CNMPoNDA AND Ll <br />R ASIDS)HALL BE A ER�l <br />'TARIFF AREA' 'HALL BE PIE OVIDED TO PREVENT VANDILIAM ATRFIA.E AND DMP011L 11 HARAID101 WRITE IR HAZAIDOII MATEMALI ITALL BE IN COMPLIANCE WITH MINN I PH 7FIG11 <br />A IN ACCORDANCE WHO THE PEIMIT, GOES WAITE SHALL RE ALCIED, COLLECTED AND MIIPGIEI GO PINPEPLI IN CIMPLIGNSE ITH MINN. I CH IPIR <br />I I AGO I I TO THE HE IMIT, ALL Po RIAILE III I I' DIED IN I TE ITALL BE MIATICNED AS THAI THE' AIR CE101E AND WILL NOT RE HOPED .1 ININIEG OVER IANULARI WAITE <br />SHALL RE D=I <br />I I ACCORDANCE WHO THE PEIM,. IOELING AND MANTENANDE 01 EIO PRINT 11 VEH ILES AND PC IF AN EVEN' ON AND IESPINSE THE IONTIAITRI SHALL TRIP REASONABLE STEPS TO <br />PREVENT THE DSCHARGE o' IP LLED OR L�RAAIMD IH�EMAILALI DNA FUEL FROM AN Y AREA RE CHMICA I, OR I I E I SOL BE LEADED OR 'PLEADED POLL IN A THE US E P, DR A PAN, OR <br />:D TH„ MEAAOD WHERE DLE IIE. IEIOVElED IPILLED MATERIAL= THE CONTRACTOR SHALL REPORT AND GLEAN <br />IAT/VEH ILER w <br />oN <br />PAIN IN A`C`FDANAAE US TO AMATERIALS) RELATEDNA <br />oN G NTH NCzaRHA .. ITAL� INA,RAIN BCRI*IceNNAee`ns INDENT NAv a wE:NALNLD, REED AREAS AS <br />'NAL RTABLZA`ON "LL INC LODE THING AN NEEDED, PLACEMENT AT T.PIEAL. ONAL GIADIND. AND I'll ESTABLISHMENT. ALL I'll EITABLINHIRENT SIT INCLIDE SEES IND MILIN .1 THE <br />THE AREA AlOIND THE .11NDING SIT RE CIIIAIED Al NOTED IN THE ER -AN IONTREFL PLAN <br />THE ASCII ITIl ITALL ENITIE FINAL ITANLIZATURN AT THE SHE IN ACC.IDANCE SITH THE IEIMIT FLAT ITAMILIZATIN 11 NOT COMPLETE INTIL ALL 111EPENLI AT FAST 11 ARE <br />BAIINI THAT ARE I, BE "ED A, PERMANENT SAFE, ,ALI, A ANAGE A IN I BASN I H AVE BE I CLEANED 0, A I ACECM ILAZACENDLANT ATI <br />PI (SIC FENCE) HAVE MOVED AN THE PORTIONS OF THE SAE FOR WHICH <br />THE GGNTRACTORs /PRE RESPONSBLE. BMPS HE_ <br />TO DECOMPGSE IN <br />STE CC"H AI IOME COMPOST LOGS) MAY FRE LEFT IN PLACE_ <br />CLIENT <br />11TH HOUR <br />RECOVERY <br />PROJECT DESCRIPTION <br />ELK RIVER <br />9672 163RD AVE NW <br />SITE DEVELOPMENT <br />CITY ELK RIVER <br />STATE MINNESOTA <br />ISSUE DATES <br />0 <br />PROJECT NO 23011 <br />DRAWN ev. MAS <br />CHECKED RV AIS <br />DRAVNNR TITLE <br />DETAILS <br />
The URL can be used to link to this page
Your browser does not support the video tag.