My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j ERMUSR 04-11-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
04-11-2023
>
6.1j ERMUSR 04-11-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:31:41 PM
Creation date
4/12/2023 4:14:32 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•�i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Kerzman — Engineering Manager <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />April 11, 2023 <br />6.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• We are planning for the next Information Security Committee meeting and are looking <br />at May 9 as a potential date. We are also working with City IT staff on a trial of multi - <br />factor authentication software. <br />• We are continuing with the Infrastructure Investment and Jobs Act (IIJA) grant <br />application process. In selecting projects for this grant application, staff looked at <br />projects ERMU already had identified within the next 5 years of the long range budget. <br />The grant covers 50% of project costs, and would apply to the 2024-2028 timeframe. <br />Staff is looking for commission consensus to support the grant application. ERMU's cost <br />between 2024-2028 would be 50% of the project total, which is $1,250,000. Formal <br />approval of spending in each year would be done through the yearly budget process, <br />but a commitment of intent to complete the projects must be submitted with the grant <br />application. A draft copy of the commitment letter is attached. <br />• Staff continues to work with DGR Engineering to assemble a bid package for the <br />transformer supply and delivery to replace the Otsego substation transformer. <br />ATTACHMENTS: <br />• IIJA GRIP Grant Application Letter of Commitment - Draft <br />Page 1 of 1 <br />222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.