My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1i ERMUSR 04-11-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
04-11-2023
>
6.1i ERMUSR 04-11-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:31:40 PM
Creation date
4/12/2023 4:13:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Dave Ninow —Water Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />April 11, 2023 <br />6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Delivered and sealed 11 new water meters. <br />• Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br />• Completed 23 routine fluoride samples <br />o All samples met MDH standards <br />o Submitted MDH Fluoride Report <br />• Submitted the Discharge Monitoring Report for the diesel generation plant to the <br />Minnesota Pollution Control Agency. <br />• Completed and submitted the 2022 Water Conservation Report to the DNR. <br />• The 60-day review period for our Wellhead Protection Plan amendment ended on April <br />3. We will host a public hearing after the commission meeting on Tuesday, April 11, at <br />5:00 p.m., in our main office conference room. <br />• 1 was present at the open house hosted by the City on March 15 for the School View <br />neighborhood street reconstruction project to answer any water main replacement <br />related questions. <br />• Staff worked with City staff and the contractor hired to demolish Elk River Meats to get <br />the building's water service properly disconnected from the water main. <br />• Staff have been busy planning for upcoming projects including Freeport Water Tower <br />maintenance, School View neighborhood water main replacement, and Highway 169 <br />water main work. <br />• We will begin flushing hydrants the week of May 8. Customers will be notified and a <br />map with the zones and dates for flushing will be made public. Flushing is expected to <br />be completed by the end of the following week. <br />ATTACHMENTS: <br />• March 2023 Pumping by Well <br />Page 1 of 1 <br />220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.