My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1f ERMUSR 04-11-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
04-11-2023
>
6.1f ERMUSR 04-11-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:31:39 PM
Creation date
4/12/2023 4:12:48 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Thomas Geiser— Operations Director <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />April 11, 2023 <br />6.1f <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Staff has been attending meetings with Sherburne County to plan for the County Road <br />44 project. <br />• We are still having issues with the fuse pads we received which were incorrectly <br />assembled. The problem is that there are some loose parts, and the nuts and bolts are <br />deteriorating. Irby Utilities is helping to facilitate a resolution to this issue. The vendor <br />has 2 of the 12 in for repairs currently. We received the 10 that were fixed. <br />• Staff is working on meeting material and equipment needs for the upcoming <br />construction season. <br />• Spending considerable time collecting information for a Grid Resilience and Innovation <br />Partnership Grant. This opportunity may assist in beneficial system upgrades. <br />• Working on a solution to the limited number of pickup trucks available to purchase. <br />• Lineworkers Matt Z., Alex P., and Alex B. performed in the American Public Power <br />Association Lineworkers Rodeo in Kansas City, Kansas March 31-April 1. Sounds like a <br />job well done and fun had by all. <br />• Staff is working through the process to change from CAD to GIS mapping. The goal is to <br />make the full switch by the beginning of 2024. <br />• 1 have begun my annual reviews with staff. <br />• We took West 1 and West 2 substations offline for system upgrades and maintenance <br />the week of March 20. We were able to restore both substations Monday, March 27. <br />Page 1 of 1 <br />217 <br />
The URL can be used to link to this page
Your browser does not support the video tag.