Laserfiche WebLink
Back rou nd <br />g <br />■ Construct a new building <br />■ Move production of pipe, manhole, and culverts indoors <br />■ Eliminate the use of at least 3 forklifts and one rubber-tired <br />gantry crane (currently 7 on site) . <br />■ Building largely screened from view by existing structures. <br />■ Proposed location over existing impervious surfaces. <br />■ Noise and dust have been concerns of Rinker's operations <br />■ Conditions included to address public comments <br />