Laserfiche WebLink
s.oR�w.,�a a�.�o� aa�n� a� �E «a�,��Eo, <br />iHE CONiRACiOR IS RESPON4BlE FIX1 ALL ON-41E INPLEMFNiAllqi OF Q1090N PNO 5£OIMENi CONiROLS IN CONPIJANCE N11H iHE REWIRWFNfl OF <br />iNE SihiE OF NINNESOiA NPDE5�505 CONSiRUCPCN SNRMWAIER GENERAL PERNIi. SiNS, <br />GENERPL CCNS1RUCilOry �[ - RE SE�IMENr REMOVALS RESIlLrS IN E%POSE� SUIL rNE PEMOVAL AN� <br />iNE HOIILiON CONSERVAlION ARFA BPNKpPROlEC11CN PRQIECi CONSISTS OF tt1E9tlOD INSiALLAlION. E%ChVhiION. PNO SiABRI]AlION OF APPRO%IMAIELY e �RACKiNG ONrO PAVE� SUR�ACES rRACKE� <br />LINEAR fEEi OF BPNK PLdiC iNE NI55551PPI RIKR. iHE OISNRBED PREh IS APPRO%INAIELY 1.3 hd2E5 ANO RIE Ep511NC PNO PROPOSEO <br />INPERN0115 ARFA IS 0 ACRES. �- MAiNrAiN ALL 9MPS llNriL WORK NAS BEEN COMPLErE� AN� SrE NAS UN�ERGONE VINAL SrABiLiZAriON. <br />iNE PROJECi PREA IS N11NIN I NILE OF ANO OISp1ARGE5 i0 RIE NISSISSIPPI RIYflE NHICH IS A SCENIC dt REq2Eh110NP1 RIVER SEGNENi PNO <br />RESiRIC1E0 NA1FR hS OES(RIBm IN iHE NPOES/505 PERMIi. iHERE PRE NO 9£iLANO IMPACTS IN iHE PRO.ECi ARFA. <br />MqL lYPES <br />P i SqL NAME IS iHE FLKRIYflE-MOSFORO COMPIf% N11H A 4LN SANO IINIFIm SOIL (YPSSIFlCAPON. <br />ENNRONNENiPl RENEW PNO PERMITS <br />iHERE PRE NO SiORMWh1ER MIIIGAPON NEASIIRES REOI11RE0 AS A RESIILi OF AN ENNRdiMFNiAL, ARCHEOLIXSCAL, OR hGENCY RENEN. iHE FOLLONNG <br />WAIER RELAIFD PERMITS APPLY i0 iH15 PRO.ECi: <br />� INNf50iA PIXLUPON CONiROL A(£NCY - NPOfS/505 LONSiRUCPON PfRMIi <br />�� OfPARiNfNi OF NhiURAL RESOURCfS - PU9l1C WAftRS WORN PQtNIi <br />�� PftNY CARPS OF fNQNf£RS - INOINDUAL PERNIi <br />NO NORN�IN OR BfLOW RIf OROINARY IIIQI WAIER IS NOi PLLONED OURING RIE FOLLONING f%CWSION OAlES: <br />�� Fl511 f%0.USION OhiES - MARCII 15 10 APRIL IS <br />�uPiNE fANiRACttIR SHN1nPLAN FORIANO INPLEMENi APPROPRIh1E CONSiRUC110N PHA4NG, �fCEiAP�£ BIIfFER SiRIPS, Hd2120NiPl 30PE d2A01NG, <br />PND ORIER CONSiRUCPON PRhCllCES i0 NININI]f EROSION. ALL ARFAS NOi ttl 9E OISNRBEO 41ALL BE NPRKm (E.G. Y.1R1 FLAGS, SiAKES, 9GN5, <br />SILi FENCE. EiC.J ON RIE PROJECi SIIE 9EFORE PNT WORK 9EQN5. <br />2 Pll E%POSm SqL PREhS MUSi BE SiABR12E0 AS SOON AS P05519LE 9Ui IN NO CAg LP1ER iNAN J DAYS PF1ER iNE CONSiRUC110N ACPNtt IN <br />iNAi PORPON OF RIE SIIE HAS lE}IPORARILY IXt PQtNPNENiLT CFA4D. <br />]. iNE CONiRACttIR MUSi SiABILIZE iNE NORNAL N£iTm PERIMEiQt OF ANY IENPORPRY IXt PQtNPNENi ORNNACE OITpI IXt SNALE iHAi ORNNS <br />WAIER FRON ANT PORPON OF iNE CONSiRUC110N 91E OR OIYERIS WAIER PROUNO iNE SIIE. MiNIN R00 LINEAL FE£i FRON iNE PROJECi mGE IXt <br />FRON iNE PqNi OF ANY OISp1ARGE INiO ANT 9JRFhCE Wh1ER. SiPHIll2hilON MiNIN iHE LASi 200 LINEAL FEEi MUSi 9E CONPIfim Y.IRIIN ]4 <br />HOURS PFiQt CONNECIINC i0 h SURFACE NA1ER. <br />4. PIPE WRETS NUSi Hh�E IENPORPRY IXt PQtNPNENi ENERCY 0159PAPON 9EFORE CONNECIINC i0 A AIRFACE WAIER. <br />5. NHEN P059B1f. ALL 40PE5 MUSi 9E CRPDEO IN SUCH A Fh5HI0N 50 iNhi iRhQ(INC NARKS MAOE FROM HEhVY EWIPNENi PRE PQtPEN01Q1LAR <br />i0 RIE SLOPE. <br />Pll AREhS DIS111RBm OIIRINC CONSiRI1CPON NIlSi BE RESiORED AS OEiNIfO IN iHESE REWIRE}IENiS. h NININUM OF 8" OF i0PS01L MUSi BE <br />INSiALIfO PRIOR i0 PERNANENi RESiORAlION. AREhS IN lHld iHE i0P SOIL HhS BEFN PLACm PNO FINI91 GRP➢EO OR PREhS iHAi Hhb£ BFFM <br />OIS111RBE0 ANO ARE NOi ACP�ELY UNOER CONSiRIICPON MIlSi BE SOOOEO OR S�EO ANO NllLtllm Y.11HIN ) OhYS OF iHE AREh NOi BONG <br />ACP�£LY NORKm.ALL EROSION fANiROL MFASURES SHALL BE MNNiNNm FOR iHE 011RhilON OF iHE PRQIEM IINiIL FlNAL SiABR12h110N HhS BEFN <br />Atl11E�ED.IF CONSiRUC110N OPERAlI0N5 OR NA�IIRPL lliNiS OPMAGE OR INIERFFRE WiH ANY ER040N CONiROL MEASIIRES, iHEY SHPll BE <br />RESiORm i0 SERYE iHEIR INIENOEO NNCPON. <br />8. P➢OIPONAL EROSION CONiROL MEASURES 91ALL BE AOOm hS NECESSPRY i0 EFFECIIYELY PROIECi iHE Nh111RAL RESOURCES OF iHE tliY. iHE <br />IENPORPRY PNO PERNANENi EROSION CONiROL PLPNS SHALL BE RENSEO h5 NFEOEO BASm ON IXIRRENi SIIE CONDIPONS PND i0 COMPLY <br />N11H Pll APPLICABIf REOIIIRENENiS. <br />�uPSE01NENi CONiROL PRACIICES MUSiSBE ESiPBLISHED ON Pll OONN GRADIFNi PERINEIERS BFFORE ANY IIPGRA01ENi LANO OISiRUBING hC11NiIES <br />BEtlN. iHESE PRhC11fE5 MIlSi RENNN IN PLACE UNPL FlNPL SiABILIZAlION HAS BEEN ACHIEYID. <br />]. IF 00`M! CRP➢IENi iREhiNENi SYS1E}I IS ONELOEOEO AOOI110NPL IIP CRAOIENi SEDIMFNi CONiROL PRhCiICES NIISi BE INSiN1ED i0 FLNINAIE <br />O�ERLOAOING iHE SNPPP MIlSi BE ANENOED i0 IOENPFY iHE AOOIiIONAL PRACPCES. <br />]. Pll SiORN ORAIN INLEiS NIlSi BE PROIECim BY APPROYID BMPS OIIRING CONSiRUC110N IlN11L ALL POlEN11AL SWRfES FOR OISCHPRGE HA�£ <br />BEEN SiABILIZm. iHESE OENfES MIlSi BE NNNiNNm IINiIL FlNAL SiABR12h110N IS ACHIEYID. INlfi PROIECPON NhY BE RENOb£0 IF A SPEtlFlC <br />SPFEtt CONfERN (SiREEi fL0001NC/fREE➢NG) HAS BEEN IDENPFIED. <br />4. IENPORPRY SiIXS(PIIfS MIISi HhK 9Li FENCE IXt O1NER EFfEC11YE SmINENi CONiROLS ON iNE 001n CRAOIENi 90E OF iHE SiOCKPRf ANO <br />SHPll NOi BE PLACm Ai lfASi RS FEEi fROM RIE ROAO, N£RPNO, PROIECim WAIER, ORAINAGE QIPNNEL, IXt STIX1MWh1ER INIf15. SttICNPILES <br />LEFi FIXt NIXtE RIAN ) OAK NUSi BE SiPBIl12ED N11N MIlL01, YECEiAPON, iPRPS OR OiHER MPRO�fD NEPNS. <br />5. KHICLE iRACKINC OF g01MENi fROM iNE PROJECi SHN1 BE NINIMIIED BY MPROYEO 9MP5. iNESE SHALL BE INSiN1fD PND MAINiAINEO Ai iHE <br />Ott APPROYID ENiRANCES. <br />8. SEOINENi RIAi Hh5 NA41E0 OR iRACKEO fRIXA RIE 91E BY EWIPMENi SHN1 BE IXEPNEO FRON PAYID AIRFACES iNRWCHWi iNE OURh110N OF <br />carvsmucnarv. <br />J. SILi FENCfS OR ORIER MPRO�£0 4DIMENi CONiROL OENCES SHN1 BE REONREO ALpiG iNE 0.1RB LINE E%CEPi FOR MPROYEO OPENINCS NHQtE <br />CONSiRUCllpi ENiRPNCES WLL 9E INSiPLlEO OR ORAINhCE R0�5 AWhY FRON RIE CIlR9. iNEg OENCES MUSi BE NAINiAINED UNPL FlNPL <br />SiA911JZAPON IS ACHIE�£0. <br />8. OUSi CONiROL NEh511RE5, SIICH AS MPl1CAllpi OF WAIER MUSi BE PERFIXtNED PQ8001CALLT OUE ttl N£hORIER, CONSiRIlC110N ACPNtt, <br />PND/OR AS OIRECIED BY RIE CIiY. <br />9. FlAWS fROM OI�fR510N pIPNNEIS qt PIPES NUSi BE ROUim i0 4DIMENiAlION 9h51N5 OR APPROPRIAIE ENERGY OISSIPAlERS ttl PRE�fNi RIE <br />iRPN�ORi OF SmINENi ttl OUIRON OR LAIERAL CON�EYORS PNO PREYflii EROSION ANO SmINENi 9UILOUP lHEN RUNOFF FLONS INttI iNE <br />CONYEFORS. <br />10. Pll SEDINENi CONiR0. NEASURES SHALL BE USEO ANO NAINiAINEO FOR iNE OURAPON OF iNE PROJECi UNPL FlNAL SiPBIll2hilON.IF <br />CONSiRUC110N OPERAlI0N5 OR NANRPL EKNiS OPMAGE qt IN1ERfERE WiH ANY Q109pi Cpi1ROL MEA9JRE5, iNEY MUSi 9E RESiORm ttl gR�£ <br />iNEIR IN1ENOm NNCPON. <br />II. PDOIPONAL SmINENi Cpi1ROL MEA9JRE5 SHN1 BE AOOEO AS NECESSARY ttl EFFECII�ELT PROIEGi iNE NANRAL RESWRCES OF iNE Qtt. iNE <br />IENPORPRY PNO PERNANENi EROSION CONiR0. PLPNS SHALL BE RENgO h5 NEEOEO BASm ON QIRRENi SIIE CONDIPONS PND ttl COMPLY N11N <br />Pll APPLICA9lf REQUIRENENTS. <br />x.� iHE fANiRACiOR SHN1 BE RESPONSIBIf FOR INSPECiING ANO NAINIENPNCE OF iHE BMPS <br />]. iHE fANiRACiOR MUSi ROIl11NFlY INSPECi iHE LONSiRIILPON PRQIEM ONCE E�£RY SEYfli OAK OIIRING AC11YE CONSiRIICiION nrvo vnnnry u <br />HOIIRS OF A RAINFALL EYENi OF 0.5 INLHES OR GREAIER IN ]4 HOIIRS. <br />]. Pll INSPEL110N5 ANO NNNIENANCE fAN011L1E0 OIIRING CONSiRIlL110N NUSi BE REfARDm IN NRIPNG PNO MIISi BE REiAINEO ONSIIE Mi iHE <br />SNPPP. REfARDS OF Ehtll INSPEC110N PNO MNNIENPNfE hCiIVI1V SHN1 INLWOE: <br />].I. OAIE ANO PME OF INSPEC110N <br />].2. NANE OF PERS�N(S) CONOIICPNG iNE INSPEC110N5 <br />].3. FlNOINGS OF INSPEC110NS, INCLUOING RECONNENOAlI0N5 FOR CIXIRECP�f AC110N5. <br />].4. Cd2REC11YE hC110N5 iAKENQNCW0ING OAlES. PNES, ANO RIE PARiT COMPIfPNG MAINIENANCE ACPNllES) <br />].5. OAIE ANO ANOUNi OF RNNFPLL EYENTS 0.5 INCHES OR GREAIER IN 24 HdlRS. <br />].6. OOq1NENiAPON OF CHPNCES NP➢E ttl iNE 5`MPP. <br />Pll EROSIdi PN� SmINENi CONiROL BMPS SHPll BE INSPECIED i0 ENSURE INIEGRItt PN� EfFECP�£NESS. ALL NONNC110NP1 BNPS 41ALL BE <br />4 REPAIRm, REPIACE�, dt SUPPLWENIEO NiN A NNC110NPL BNP. <br />U51 COMPLv WI1H ALL O1HER POLLUIION PREVENIION/G00� HOUSEKEEPING REOUIFEMENIS IN 1HE MPCA NP�ES IXlN51FUC1lON <br />ALL�WABLf NON-SipRMWAifR �ISCHARGES. AS �fFINf� BY 1Hf GfNfRAL PfRMIT. ARf LIMITED 10 �fWATfRING AN� BASIN �RAINING. <br />DEWATERING OR BASIN DRAINING 1HA1 MAY HAVE 1URB1� OR SEDIMENI LA�EN �ISCHARGE WA1ER MUS1 BE �ISCHARGED 10 A <br />iEMPORARY OR PfRMANENT SEDIMfN1ATI0N BASIN ON THf PR�JfCT SiE WHENfVfR POSSIBLE. IF 1Hf WATfR CANNOi Bf �ISCHARGED <br />i0 A SEDIMEN1A710N BASIN PRIOR i0 ENTERING THE SURFACE WATER,Ii MUS1 BE iREA1ED W11H 1HE APPROPRIAiE BMPS, SUCH 1HAT <br />iHE DISCHARGf �OfS NOi ADVfRSfLY AFFfCT THE RECfIVING WAiER OR �OWNS1RfAM LAN�OWNfRi iHE G�NiRACiOR M1151 fNSURf <br />iHA1 DISCNARGE POINTS DISPERSED OVER NAlURAL ROCK RIPRPP, SAND BAGS, PLASiIC SNEEIING OR OTNER ACCEPIED ENERGV <br />�ISSIPATION MEASl1Rf5. A�f�UAlf Sf�IMENiA710N CONiROL MEASURfS ARf RfOUIRf� FOR �ISCHARGf WATER iHAi CONTAINS <br />Sl1SPENDED SOLIDS. ALL WATER FROM DEWAiERING OR BASIN DRAINING M11S1 9E �ISCHARGEO IN A MANNER iHAi DOES NOT CAIISE <br />NwsnNce coNoirioNs. eeasiaN iN eeceimNe cnnNNe�s oe oN ooams�oPe PeoPerenes. ore iNUNoarioN iN wel�nNos enusiNc <br />SIGNIFICANT ADVERSE IMPACT TO iHE WEILANO. IF 1HE CONIRACTOR ELECIS TO 11TILIZE FILTERS !MiH BACKWASH WA1ER, 1HE <br />CONIRACIOR MUSi HAIIL 1Hf BACKWASH WAifR AWAY FOR �ISPOSAL REil1RN 1Hf BACNWAifR 10 THf BfGINNING OF THE TRfA1MENi <br />PROCESS, OR INC�RPORAlE 1HE 9ACKWASH WATER IN10 iNE SIiE IN A MANNER 1HAT DOES NOT CAUSE EROSION. 1HE CONIRACIOR <br />MU51 REPLACf AN� CLEAN 1Hf FILTfR Mf�IA USf� IN �fWATERING �fNCES WHEN REQIIIRf� 10 RfTAIN A�faVAlf FUNCTION. <br />CONIRACIOR S-IALL OBiAIN A WATER USE (APPROPRIATION) PERMIT FROM 1HE MN �NR FOR �EWAIERING AC11VIiIES THAT WILL <br />!MiNDRAW MORE 1HAN 10,000 GALLONS OF WA1ER PER �AV OR 1 MILLION GALLONS PER YEAR. <br />I.3. PL EROSION PREVENIION AN� SE�IMEN1 IXlN1FOL BMPS (SUCH AS SIL1 FENCES) MUSr BE FEMOVED CS <br />1INGEN, PE, uNIVEFSItt OF MINNESOIA �ESIGN WPPP (E%PIRES MAv 3'I. 2�23) <br />�� <br />� <br />U <br />� <br />� � <br />� W <br />� i <br />� <br />z <br />� � <br />� W <br />U <br />W � <br />� O <br />� <br />� � <br />U <br />� L� <br />C1 �U <br />�tnV♦ <br />