My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.6 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 10:19:52 AM
Creation date
3/17/2023 10:04:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Houlton Conservation Area Bank Protection — Mississippi Site <br />Elk River, Minnesota <br />PROVIDED, that beneficiaries oY claimants heYeundeY shall be limited to the subcontractors, and <br />persons, firms and corporations having a direct contract with the principal or its subcontractors. <br />PROVIDED, FURTHER, that the said SuretyT for value received herebyT stipulates and agrees that no <br />change, extension of time, alteYation or addition to the teYms of the contract oY to the Work to be <br />performed thereunder oY the Contract Documents accompanyring the same shall in any way affect its <br />obligation on this BOND, and it does herebyT waive notice of anyT such change, extension of time, <br />alteration or addition to the teYms of the contract or to the WoYk or to the ContYact Documents. <br />PROVIDED, FURTHER, that no suit or action shall be commenced hereunder by any claimant: (a) <br />Unless the claimant, other than one having a direct contract with the Contractor, shall have given <br />written notice to any two of the following. the Contractor, the Owner, or the SuretyT above named <br />within ninetyr (90) days afteY such claimant did oY performed the last of the work or laboY, oY furnished <br />the last of the materials for which said claim is made, stating with substantial accuracyT the amount <br />claimed and the name of the parnT to whom the materials were furnished, or for whom the work or <br />labor was done or performed. Such notice shall be served by mailing the same b�r registered mail or <br />certified mail, postage prepaid, in an envelope addressed to the Contractor, O�vner, or Suret�r, at any <br />place where an office is regularlyT maintained for the transaction of business, or served in anyT manner <br />in which legal process may be served in the state in which the afoYesaid pYoject is located, save that <br />such service need not be made by a public officer. (b) After the expiration of two (2) years follo�ving <br />the date of which Contractor ceased work on said Contract, it being understood, ho`vever, that if any <br />limitation embodied in the Bond is prohibited by an�T la`v controlling the construction hereof, such <br />limitation shall be deemed to be amended so as to be equal to the minimum period of limitation <br />permitted byT such law. <br />PROVIDED, FURTHER, that it is expresslyT agreed that the Bond shall be deemed amended <br />automatically and immediately, without formal and separate amendments hereto, upon amendment to <br />the Contract not increasing the contract price more than 20 peYcent, so as to bind the ContractoY and <br />SuretyT to the full and faithful performance of the Contract as so amended. The term "Amendment", <br />`vherever used in this Bond, and `vhether referring to this Bond, the Contract or the Loan Documents <br />shall include anyT alteration, addition, extension, or modification of an�T character �uhatsoever. <br />PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall <br />abridge the right of an�T beneficiaryT hereunder, `vhose claim mayT be unsatisfied. <br />Payment Bond <br />
The URL can be used to link to this page
Your browser does not support the video tag.