My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.6 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 10:19:52 AM
Creation date
3/17/2023 10:04:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manual <br />Houlton Conservation Area Bank Stabilization — Dam Site <br />B. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for <br />delay, disruption, or interference caused by or within the control of Contractor or their <br />subcontractors or suppliers. <br />C. If Contractor's performance or progress is delayed, disrupted, or interfered with by <br />unanticipated causes not the fault of and beyond the control of Owner, Contractor, and those <br />for which they are responsible, then Contractor shall be entitled to an equitable adjustment <br />in Contract Times. <br />D. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for any <br />delay, disruption, or interference if such delay is concurrent with a delay, disruption, or <br />interference caused by or within the control of Contractor or Contractor's subcontractors or <br />suppliers. <br />4.04 Progress Schedules <br />A. Contractor shall develop a progress schedule and submit to the Engineer for review and <br />comment before starting Work on the Site. The Contractor shall modify the schedule in <br />accordance with the comments provided by the Engineer. <br />B. The Contractor shall update and submit the progress schedule to the Engineer each month. <br />The Owner may withhold payment if the Contractor fails to submit the schedule. <br />ARTICLE 5 — CONTRACT PRICE <br />5.01 Payment <br />A. Owner shall pay Contractor in accordance with the Contract Documents at the following <br />amounts for each unit of Work completed: <br />1. For all Work, at the prices stated in the Contractor's Bid, attached hereto as an exhibit. <br />2. Payment will be made in an amount equal to the total of all extended prices for actual <br />Work completed. The extended price is determined by multiplying the unit price times <br />the actual quantity of that Work item completed. Actual quantities installed will be <br />determined by the Engineer. <br />Division 00 Section 00 52 00-3 <br />Contracting Requirements Contract for Construction <br />EJCDC� G522, Copyright O 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society <br />of Civil Engineers. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.