Laserfiche WebLink
Houlton Conservation Area Bank Protection — Mississippi Site <br />Elk River, Minnesota <br />Bidder's Verification of Compliance <br />The undeYsigned, being first dul�r swoYn, as BiddeY on the Project, YepYesents and swears as <br />follo�vs: <br />No`v, and at all times during the duration of the Project, the undersigned complies <br />with each of the rninimum criteria in l��inn. Stat � 16C.285, subd. 3, the Responsible <br />Contractor statute. <br />The undersigned understands that a failure to meet or verifyT compliance `vith the <br />minimum criteria established for a"responsible contractor" as defined in Minn. Stat � <br />16C.285, subd. 3 rendeYs a bidder ineligible to be awarded a construction contract for the <br />PYoject or to perform work on the Project. <br />Upon request, the undersigned will submit copies of the signed verifications of <br />compliance from all subcontractors. <br />The undersigned understands that a false statement under oath verifyTing compliance <br />with any of the minimum criteria shall make the undersigned or its subcontractor that makes <br />the false statement ineligible to be awarded a construction pYoject and may result in <br />termination of a contract awarded to a the undersigned or its subcontractor that submits a <br />false statement. <br />Bidder: <br />JK LANDSCAPE CONSTRUCTION <br />By,; JERRY KONZ <br />Its: OWN ER <br />End of Section <br />Bid Form <br />