My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.6 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 10:19:52 AM
Creation date
3/17/2023 10:04:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manual Houlton Conservation Area Bank Stabilization - Dam Site <br />ARTICLE 5- BASIS OF BID <br />5.01 Bidder will complete the Work in accordance with the Contract Documents for the following <br />price(s): <br />Item Est. Bid Unit <br />No. Description Unit Bid Price <br />Qty. Price <br />2021.501/00010 Mobilization LS 1 <br />2051.501/00010 Maint. & Restoration of Haul Roads LS 1 N.` �,s� <br />2101.501/00020 Clearing and Grubbing LS 1;<:� � <br />2106.507/00010 Excavation - Common CY ;� <br />2106.507/00130 Common Embankment (CV) � � 061 <br />�� � � 273 <br />2573.503/00031 Flotation Silt Curtain Type Moving Wate�� ;.�f�F <br />2574.505/00010 Subsoiling � `� �q��;�__� p,g <br />2574.505/00020 Soil Bed Preparation "'�� - ��`�p;� y p,g <br />��; - <br />2575.504J00325 Rolled Erosion Preven�fi' Categor; 25�` SY 3874 <br />2575.505/00021 Seeding ����2` AC 0.8 <br />2575.505/00035 Mowing „- �A��� " AC 2 <br />2575.505/00040 We�d� �raying AC 0.5 <br />2575.506/00010 VU�ed Spray Mixture GAL 0.5 <br />2575.508/21111 Seed Mixture 21-111 LBS 80 <br />2575.508/35221 Seed Mixture 35-221 LBS 30 <br />2577.603/00010 Toewood Bench LF 1110 <br />Total of All Unit Price Bid Items $ <br />Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be <br />adequate to cover Contractor's overhead and profit for each separately identified item, and (2) <br />estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, <br />and final payment for all unit price Bid items will be based on actual quantities, determined as <br />provided in the Contract Documents. <br />ARTICLE 6- TIME OF COMPLETION <br />6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for <br />final payment in accordance with Article 4 of the Contract on or before the dates or within the <br />number of calendar days indicated in the Contract. <br />6.02 Bidder accepts the provisions of the Contract as to liquidated damages. <br />ARTICLE 7-ATTACHMENTS TO THIS BID <br />7.01 The following documents are submitted with and made a condition of this Bid: <br />A. Section 00 41 15 Responsible Contractor- Proposal Attachment; and <br />_.� _x__ _.�._,� �.�« __r�.. <br />_��.z�.s _ ..-_���.�� _...rm � .�.".,�..��,._u, <br />Division 00 <br />Procurement Requirements <br />Section QO 4143-3 <br />Bid Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.