My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.6 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 10:19:52 AM
Creation date
3/17/2023 10:04:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manual Houlton Conservation Area Bank Stabilization — Dam Site <br />SECTION 00 41 10 <br />BID FORM <br />ARTICtE 1— BID RECIPIENT <br />1.01 This Bid is submitted to: <br />ELECTRONICALLY ONLY VIA QUESTCDN <br />CITY OF ELK RIVER <br />13065 ORON� PARKWAY <br />ELK RIVER, MN 55330 <br />1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement <br />with Owner in the form included in the Bidding Documents to perform all Work as specified or <br />indicated in the Bidding Documents for the prices and within the times indicated in this Bid and <br />in accordance with the other terms and conditions of the Bidding Documents. <br />ARTICLE 2 — BIDDER'S ACKNOWLEDGEMENTS <br />2.01 Bidder accepts all of the terms and conditions of the Instructions ta Bidders. This Bid will remain <br />subject to acceptance for 60 days after the Bid opening, or for such longer period of time that <br />Bidder may agree to in writing upon request of Owner. <br />ARTICLE 3 — BIDDER'S REPRESENTATIONS <br />3.01 In submitting this Bid, Bidder represents that: <br />A. Bidder has examined and carefully studied the Bidding Documents, and any data and <br />reference items identified in the Bidding Documents, and hereby acknowledges receipt of <br />the following Addenda: <br />Addendum No. Addendum, Date <br />NONE <br />B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and <br />adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site <br />conditions that may affect cost, progress, and performance of the Work. <br />C. Bidder is familiar with and has satisfied itself as to alf Laws and Regulations that may affect <br />cost, progress, and performance ofthe Work. <br />D. Bidder has considered the information known to Bidder itself; information commonly known <br />to contractors doing business in the locality of the Site; information and observations <br />obtained from visits to the Site; the Bidding Documents; and any Site-related reports and <br />drawings identified in the Bidding Documents, with respect to the effect of such information, <br />observations, and documents on (1) the cost, progress, and performance of the Work; (2) <br />the means, methods, techniques, sequences, and procedures of construction to be employed <br />by Bidder; and (3) Bidder's safety precautions and programs. <br />_ _ . ._z_ .___ T:..zv,.�._ �_.,z_ -._,— —�... _.____ ,� �,_....�„a�_�.F.a <br />Division 00 Section 00 41 43-1 <br />Procurement Requirements Bid Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.