My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 03-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
03-20-2023
>
4.6 SR 03-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 10:19:52 AM
Creation date
3/17/2023 10:04:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manual <br />Houlton Conservation Area Bank Stabilization — Dam Site <br />questions answered by Addenda will be binding. Oral and other interpretations or clarifications <br />will be without legal effect. <br />6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable <br />by Owner or Engineer. <br />ARTICLE 7 — CONTRACT TIMES <br />7.01 The number of days within which, or the dates by which milestones are to be achieved and the <br />Work is to be substantially completed and ready for final payment are set forth in the Contract. <br />ARTICLE 8 — LIQUIDATED DAMAGES <br />8.01 Provisions for liquidated damages, if any, are set forth in the Contract. <br />ARTICLE 9— SUBSTITUTE AND "OR-EQUAL" ITEMS <br />9.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described <br />in the Bidding Documents without consideration of possible substitute or "or-equal" items. <br />Whenever it is specified or described in the Bidding Documents that a substitute or "or-equal" <br />item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, <br />application for such acceptance will not be considered by Engineer until after the Effective Date <br />of the Contract. <br />ARTICLE 10 — PREPARATION OF BID <br />10.01 The Bid Form and attachments are included with the Bidding Documents. Photocopies of these <br />documents should be made for the purpose of submitting the Bid. <br />10.02 All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or <br />alterations shall be initialed in ink bythe person signingthe Bid Form. A Bid price shall be indicated <br />for each section, Bid Item, Alternate, adjustment Bid Unit Price Bid Item, and Bid Unit Price Bid <br />Item listed therein. <br />10.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice- <br />president or other corporate officer accompanied by evidence of authority to sign. The corporate <br />Division 00 Section 00 21 13-3 <br />Bidding Requirements Instructions to Bidders <br />
The URL can be used to link to this page
Your browser does not support the video tag.