My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 03-14-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
03-14-2023
>
5.2 ERMUSR 03-14-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 8:58:09 AM
Creation date
3/13/2023 8:58:09 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities 5 SupplierCore & Main LP <br />“Equipment” means Network Equipment, Endpoints, Meters, Modules, Router, and any other <br />hardware that ERMU purchases from Supplier. <br /> <br />“Equipment Warranty Period” means the duration of the manufacturer’s warranty as defined <br />in the manufacturer’s warranties attached hereto in Attachment X. <br /> <br />“Final System Acceptance” means that ERMU has at the completion of Phase II Full <br />DeploymentDelivery, accepted the Work provided by Supplier after Supplier and ERMU, in <br />cooperation with the manufacturer, hasve performed a FSAT with results satisfactory to ERMU <br />as measured against the System Acceptance Test criteria set forth in Attachment V and satisfying <br />Specifications in Attachment I. <br /> <br />“FSAT” means Final System Acceptance test in after Phase II. <br /> <br />“Firmware” means software embedded in and provided with the Equipment. <br /> <br />“Initial System Acceptance” means the ERMU has, within six (6) months after completing the <br />Phase I Initial Deployment, accepted the Work provided by Supplier after ERMU and Supplier <br />have jointly performed an ISAT, with cooperation of the manufacturer, defined below, with <br />results satisfactory to ERMU as measured against the System Acceptance Test criteria set forth <br />in Appendix VIIAttachment V and satisfying Specifications in Attachment I. <br /> <br />“ISAT” means Initial System Acceptance test in after Phase I. <br /> <br />“Life Expectancy” means a term of fifteen (15) years beginning on the date of Final System <br />Acceptance. <br /> <br />“Meter” means a device that measures the supply of electricity and water provided by ERMU. <br /> <br />“Module” means a device used to connect to the AMI System provided by Supplier. <br /> <br />“Network Equipment” means the Collectors, Routers, fiber optic interface points, and radios <br />for radio frequency (RF) that are, or will be, under this Agreement physically deployed for <br />ERMU. The term does not include the AMI System backhaul, the network operations center, or <br />Meters. <br /> <br />“Non-Associating Meter” means an installed Meter and Module that have not established <br />communication with the AMI System within twenty-four (24) hours of the installation time <br />during Phase I and II or has lost communication with the AMI System for a period of twenty- <br />four (24) or more hours. <br /> <br />“Project Manager” means the individual designated by each Party as the representative acting <br />on the Party’s on behalf on matters relating to the planning and execution of the Work under this <br />Agreement. <br /> <br />197
The URL can be used to link to this page
Your browser does not support the video tag.