Laserfiche WebLink
Elk River Municipal Utilities 13 SupplierCore & Main LP <br />and replace provide replacements for defective Meters or Modules and ship them to the <br />appropriate location for repair or further inspection at no cost to ERMU pursuant to the Sensus <br />Return Material Authorization process. Supplier shall remedy the defect under the terms of the <br />manufacturer’s warranty. <br /> <br />For all Non-Associating Meters discovered during Phase I and Phase II Deployment and any <br />warranty period, Supplier shall provide ERMU with replacement Meters or Modules as needed <br />under the terms of the manufacturer’s warranty. <br /> <br />14. Major Catastrophic Meter or Module Failure <br />If during the AMI System Warranty Period a major catastrophic failure of the Meters or Modules <br />provided by the Supplier occurs (with “major failure” being defined as failure to perform <br />according to the Specifications of over two percent (2%) of the installed Meter or Module within <br />any rolling twelve (12) month period), correction will be pursued as set forth in the <br />manufacturer’s warrantyCatastrophic Electric Meter Warranty or Catastrophic Water Meter <br />Warranty attached hereto in Attachment X. <br /> <br />Meter and Module failures will be tracked by ERMU and reported to Supplier on a mutually <br />agreed schedule. <br /> <br />15. Meter Disconnection or Reconnection Failure <br />A Meter disconnection or reconnection failure is defined as any time the AMI System either a) <br />properly performs a disconnect command but cannot properly perform a reconnect command or <br />b) improperly initiates a remote disconnect to a single Endpoint or to multiple Endpoints and <br />remains unable to automatically reconnect power. <br /> <br />In case of such event, ERMU will inform Supplier, at which point correction will be pursued <br />pursuant to the manufacturer’s warranty. <br /> <br />16. Tests and Inspections <br />The Equipment furnished pursuant to the Specifications in the appendices to this Agreement <br />shall be in compliance with all of the standard commercial inspections and tests normally <br />performed by Supplier and its Subcontractors or other suppliers. Supplier shall furnish ERMU <br />with such certified information and test certificates as are normally made available to customers <br />of Supplier’s manufacturing divisions and subsidiaries and other manufacturers of Equipment <br />specified within. ERMU or its agent has the right to witness all factory and site tests and <br />inspections. ERMU shall not be required to accept any Equipment until the Equipment has <br />undergone and successfully met such tests and inspections. <br /> <br />ISAT. The Supplier and ERMU, in cooperation with the manufacturer, will complete an ISAT to <br />validate the completion of Phase I Initial Deployment of the AMI System by Supplier, in <br />accordance with the Specifications identified in the appendices to this Agreement, including <br />Supplier’s proposal and the Functional Testing and System Acceptance Testing Criteria set forth <br />in the attached Attachment V. ISAT shall be completed within six (6) months of the completion <br />205