My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 03-14-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
03-14-2023
>
5.2 ERMUSR 03-14-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 8:58:09 AM
Creation date
3/13/2023 8:58:09 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities 11 SupplierCore & Main LP <br />10. Amendments and Change Orders <br />Changes to the terms and conditions of this Agreement can only be made by a written <br />amendment signed by duly authorized representatives of both Parties. <br /> <br />Changes to the scope of the Work, Agreement price, and schedule can only be made by a written <br />change order signed by duly authorized representatives of both Parties. No other verbal or <br />written communication or action or failure to act on the part of either Party can substitute for a <br />written amendment or change order. <br /> <br />Change Order Procedure. Either Party may request a change in the scope of the Work, <br />Agreement price, or schedule by providing a written change order request to the other Party in <br />advance. When a written change order is received, the receiving Party shall respond to the <br />request within ten (10) business days either accepting or denying the requested change. If no <br />response is made within the required time, the change order request will be deemed denied. <br />If the terms of a change order are agreed to, the requesting Party shall provide an executed copy <br />to the other Party for signature. The Party accepting the request shall sign and return the signed <br />change order to the requesting Party. <br /> <br />When invoicing for change order items, Supplier shall reference the change order and separately <br />identify the items subject to the change order. <br /> <br />11. Deployment Plan <br />The deployment shall occur in two phases. Phase I and Phase II are defined in Attachment V – <br />Statement of Work and shall be conducted according to Attachment VI IV - Deployment <br />Proposed Project Plan and the Schedule that will be developed and agreed to by the Parties prior <br />to beginning the Work. Phase I shall include but not be limited to: <br /> <br /> Project design meeting; receipt of standard AMI System documentation and training <br />manuals covering the scope of this Agreement; review and approval of ERMU’s <br />coverage area and design drawings for the initial deployment area. <br /> <br /> Configuration of AMI System server and hardware components and delivery of <br />configured software and hardware to ERMU; training on use of the Software for the AMI <br />System. <br /> <br /> Delivery of Phase I base stations, collectors, repeaters, load management end devices, <br />gateways, Meters, and Modules as determined prior to Agreement signing. <br /> <br /> Completion of onsite support and training covering Equipment installation, Meter or <br />Module, inspection of the Work and training installation, AMI System training including <br />support on report generation. <br /> <br /> Successful completion of the ISAT and Initial System Acceptance. <br /> <br />203
The URL can be used to link to this page
Your browser does not support the video tag.