My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 PRSR 03-08-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2023
>
03-08-2023
>
7.1 PRSR 03-08-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 3:56:52 PM
Creation date
3/3/2023 3:56:43 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
3/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 ELK RIVER PARKS & RECREATION <br />EXECUTIVE SUMMARY <br />Elk River is a growing community at the northwestern edge of the Twin Cities metro. The city is “Powered by Nature” and the <br />importance of parks and recreation is enormous in this community. Many of Elk River’s families have been a part of the youth <br />athletics associations and sports are part of what helps defi ne Elk River’s character. <br />The city has worked hard to provide its youth and adult athletes with safe and fun athletic facilities. This is most recently <br />evidenced in the development of the Furniture and Things Community Even Center multi-purpose facility, Lion John Weicht Park, <br />and improvements at the schools. This study is to help understand the current and future needs of the community, protecting <br />existing assets, and also serving as guide for new investments. This was completed through review of city qualitative and <br />quantitative data, user group input, and consultant analysis of trends, demographic projections, and recreation standards. <br />Elk River continues to grow, in both overall and youth population. This is putting additional demand on the athletic facilities. <br />The study identifi ed qualitative and quantity/capacity related needs and opportunities, both currently and anticipated. Needs <br />identifi ed included: <br />Supporting and <br />strengthening the <br />relationship between the <br />schools and the city for <br />the provision of athletic <br />facilities in the community <br />Longer term expansion <br />of capacity through <br />construction of <br />additional fi elds <br />Continuing to pursue <br />tournaments that <br />provide unique hosting <br />experiences for the <br />athletes and bring <br />people to Elk River <br />Safety and user experience <br />improvements such as <br />netting, restrooms, and other <br />support facilities as well as <br />improved maintenance (both <br />city and school) of fi elds <br />This study recommends: <br />• Continue to maintain additional fi elds that can fl ex in order to <br />accommodate weather and tournament induced peaks in demand. <br />• Improve facilities at DAAC to modernize the facility and improve <br />user experience <br />• Continue to limit access after weather events or long winters. <br />• Add two 60’ and two 75’ baseball fi elds with grass infi elds. This could <br />happen entirely at YAC or may include upgrades to the ballfi elds at <br />Oak Knoll to dedicated baseball fi elds with grass infi elds. <br />• Addition of 1-2 90’ baseball fi elds in the community <br />• Continue to evaluate usage, and if baseball shifts to OKAC, increase <br />availability for softball at YAC. <br />• Consider the development of an additional 3-4 small fi elds with <br />200-225’ fences in the long run (by 2035) to accommodate growing <br />and future demand. <br />• Consider the development of 4 rectangle fi elds over the long term <br />(by 2035) to accommodate growing and future demand. <br />• Explore bringing amenities to the fi eld at YAC similar to what has <br />been constructed at the ballfi elds. If the expansion occurs, it may be better to focus investments on support facilities in that <br />area. <br />• Continue to work with youth associations to bring more tournaments to Elk River, particularly with weekend availability. <br />• Consider opportunities to double up scheduling, particularly when school users do not go later than 6 p.m. <br />Sources: US Census, Elk River Comprehensive Plan, ESRI <br /> - <br /> 5,000 <br /> 10,000 <br /> 15,000 <br /> 20,000 <br /> 25,000 <br /> 30,000 <br />1990 1995 2000 2005 2010 2015 2020 2025 2030 2035DAACOKACYACLJWP renovationYAC expansionPopulation Growth and Field Development in Elk River
The URL can be used to link to this page
Your browser does not support the video tag.