My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 PRSR 03-08-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2023
>
03-08-2023
>
7.1 PRSR 03-08-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 3:56:52 PM
Creation date
3/3/2023 3:56:43 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
3/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 ATHLETIC FIELDS STUDY <br />City of Elk River, Minnesota <br />0% <br />10% <br />20% <br />30% <br />40% <br />50% <br />60% <br />70% <br />80% <br />90% <br />100% <br />April <br />Week 1 <br />April <br />Week 2 <br />April <br />Week 3 <br />April <br />Week 4 <br />May <br />Week 1 <br />May <br />Week 2 <br />May <br />Week 3 <br />May <br />Week 4 <br />May <br />Week 5 <br />June <br />Week 1 <br />June <br />Week 2 <br />June <br />Week 3 <br />June <br />Week 4 <br />July <br />Week 1 <br />July <br />Week 2 <br />July <br />Week 3 <br />July <br />Week 4 <br />July <br />Week 5 <br />Small Sized Baseball/Softball - Weekdays <br />Used by Others Used by Youth Baseball Used by Youth Softball Not Used <br />0% <br />10% <br />20% <br />30% <br />40% <br />50% <br />60% <br />70% <br />80% <br />90% <br />100% <br />April <br />Week 1 <br />April <br />Week 2 <br />April <br />Week 3 <br />April <br />Week 4 <br />May <br />Week 1 <br />May <br />Week 2 <br />May <br />Week 3 <br />May <br />Week 4 <br />May <br />Week 5 <br />June <br />Week 1 <br />June <br />Week 2 <br />June <br />Week 3 <br />June <br />Week 4 <br />July <br />Week 1 <br />July <br />Week 2 <br />July <br />Week 3 <br />July <br />Week 4 <br />July <br />Week 5 <br />Small Sized Baseball/Softball - Weekends <br />Used by Others Used by Youth Baseball Used by Youth Softball Not Used <br />SMALL SIZED BASEBALL/SOFTBALL FIELDS <br />Softball and youth baseball are both strong programs in Elk River, and are using much of the available fi eld space in the community. <br />This extends from late April through July. While a small amount of capacity is shown for the weekdays, having a small amount of <br />buff er is helpful for rescheduling games. <br />There have been some questions from the community about whether the fi elds that are reserved are really being utilized, or if the <br />pricing structure simply incentivizes associations to reserve as much fi eld space as they can, even if they are not going to use it. While <br />it probably does occur, this does not appear to be the main driver limiting supply. <br />It is worth noting that the city does not have many fi elds with smaller fence dimensions. Only one at OKAC and the two softball <br />fi elds (which are prioritized to the schools) are at the smaller dimensions. Temporary fencing is available at most fi elds and used in <br />some instances. This is a good intermediate step, but dedicated small fi elds are preferable from a user experience perspective. <br />RECOMMENDATIONS <br />• When the Lion John Weicht fi elds are being used for practice by the schools, schedule a second set of practices for youth softball. <br />• Develop at least 2 dedicated 60’ baseball fi elds with grass infi elds. This could be an upgrade to the small ballfi eld at Oak Knoll <br />(with the addition of lights) or be located as part of a future YAC expansion. These fi elds should have 200’-225’ fences. <br />• Continue to maintain YAC 1-4 as high quality small baseball/softball fi elds. If OKAC changes to a dedicated baseball facility, <br />increase availability for softball at YAC. <br />• Consider the development of an additional 3-4 small fi elds with 200-225’ fences in the long run (by 2035) to accommodate <br />growing and future demand. <br />• Improve facilities at DAAC to modernize the facility and improve user experience <br />-Permanent restrooms and upgrades to shelters/buildings <br />-Netting at spectator areas <br />Preferred 25% fi eld rest and recovery <br />Preferred 25% fi eld rest and recovery
The URL can be used to link to this page
Your browser does not support the video tag.