My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 02-21-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-21-2023
>
8.1 SR 02-21-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 4:20:24 PM
Creation date
2/17/2023 8:51:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />Next Steps <br />The critical next step for this study is to complete significant environmental review, as required by <br />the National Environmental Policy Act (NEPA), to fully analyze these conceptual alternatives and <br />implementation strategies. Through this environmental process, interchange design and <br />implementation will be determined. The environmental review process also includes additional <br />opportunities for public input. Following the environmental review, the project would move into <br />preliminary and final design. <br />The goal of the study was to identify a long-term 20+ year vision for the Highway 10 corridor ensures <br />safe and efficient operations along the Highway 10 corridor while supporting economic development <br />within the area and region. Implementation of the long-term vision will take commitment and <br />collaboration from all study partners. The cities, counties, and MnDOT will need to continue to <br />collaborate to determine next steps such as environmental review, preliminary and final design, and <br />agency cost sharing and coordination. <br />�GHW4Y <br />`� ■ _ • <br />�Rp.IhJRih`o <br />
The URL can be used to link to this page
Your browser does not support the video tag.