My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 02-21-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-21-2023
>
8.1 SR 02-21-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 4:20:24 PM
Creation date
2/17/2023 8:51:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />Long-Term Vision <br />Following the second round of stakeholder and public engagement, additional discussions with the <br />PMT occurred to confirm the long-term vision for the Highway 10 Corridor would be a grade- <br />separated corridor with interchanges at Highway 169 (existing), Twin Lakes Road and Adams Street <br />(see Figure E-�. Additionally, access closure and a robust local roadway network will be needed to <br />support this long-term vision (see Figure E-2�. MnDOT and the City will need to have additional <br />coordination to determine the final access configuration for 173rd Avenue and 171st Avenue. At the <br />conclusion of this study consensus was not reached. The configuration shown in FigureE-2is the <br />City's preferred Highway Local Roadway Network. MnDOT's preference would be to have full access <br />closures at 173rd Avenue and 171stAvenue (see FigureE-,�. <br />Figure E-1. Highway 10 Long-Term Vision <br />�GHW4Y <br />`� ■ _ <br />�Rp.IhJRih`o <br />
The URL can be used to link to this page
Your browser does not support the video tag.