My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 02-21-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-21-2023
>
4.5 SR 02-21-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:29 PM
Creation date
2/16/2023 1:27:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />Elk -�-� <br />RiVer <br />City of Elk River <br />City Council <br />Resolution 23- <br />A Resolution of the City Council of the City of Elk River Supporting <br />Corridors of Commerce Funding For the US Highway 10/169 Safety and <br />Congestion Mitigation Project <br />WHEREAS, US High�va�T 10/169 is a State High`va�T used for personal and freight <br />transportation with local and regional connections; and <br />WHEREAS, traffic volumes continue to gro�v as the regional population increases; and <br />WHEREAS, the safety and performance of this corridor continues to decline everyT year; <br />and <br />WHEREAS, existing and future traffic volumes are such that congestion is and will <br />continue to negativelyT impact the abilityT of the corridor to move traffic; and <br />WHEREAS, the CityT of Elk River, in parmership �vith iVIriDOT, Sherburne CountyT, <br />Anoka CountyT and the CityT or RamseyT has developed preliminary locations and la�Tout for <br />t�vo grade separated interchanges; and <br />NOW, THEREFORE, BE IT RESOLVED b�T the CityT Council of the CityT of Elk <br />River,l�linnesota, as follo�vs: the Elk River Cit�- Council supports a project that provides <br />two gYade sepaYated interchanges (TH10/169 at Twin Lakes Road and TH10/169 and <br />Adams Street) and associated frontage and backage road connections consistent `vith the <br />locallyT supported option that has been included in the recentlyT completed HighwayT 10 <br />Corridor Stud�T. <br />Passed and adopted this 21s` day of Februaryr 2023. <br />John J. Dietz, Mayor <br />ATTEST: <br />Tina Allard, CityT Clerk <br />rowEREo er <br />���V�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.