My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 02-21-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-21-2023
>
4.4 SR 02-21-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 9:57:15 AM
Creation date
2/16/2023 1:17:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RADIAL OR <br />� \ �TRAPEZOIDAL CHANNEL � <br />\� � - - - i <br />/ <br />CROSS SECTIONAL VIEW <br />�STORM WATER <br />SHALL BE CONTAINED <br />� TO THE CHANNEL <br />/ / <br />� EXISTING GROUND <br />PRIOR TO INSTALLING HEADWALL, <br />USE CONCRETE SAW ANCHOR TRENCH INITIAL LEADING <br />TO CUT MAT TO EXACT EDGE OF MAT 18", FILL AND <br />SHAPE AND SIZE COMPACT ANCHOR TRENCH. <br />INSTALL HEADWALL OVER MAT <br />� ❑ ❑ ❑ ❑ ❑ Ci` ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />� ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />� ❑ ❑ ❑ ❑ ❑ �.: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />% ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />���������� MAXIMUMGRADE <br />i� pppppppppppp PERMFGSPECIFICATIONS <br />� ❑ ❑ ❑ ❑ ❑ ❑ C;` ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />� ❑ ❑ ❑ ❑ ❑ ❑ C��7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />�nnnnnnnnnnnnnnnnnn nnn <br />PLAN <br />CONCRETE MAT <br />CONSTRUCTION NOTES: <br />1. GRADE OUTFALL AREA SO THAT WATER WILL FLOW DOWN THE CENTER OF THE CHANNEL AND BE <br />CONTAINED TO THE CHANNEL. ALL SUBGRADE SURFACES PREPARED FOR PLACEMENT OF MATS <br />SHALL BE SMOOTH AND FREE OF ALL ROCKS, STICKS, ROOTS, OTHER PROTRUSIONS, OR DEBRIS <br />OF ANY KIND. THE PREPARED SURFACE SHALL PROVIDE A FIRM UNYIELDING FOUNDATION FOR <br />THE MATS WITH NO SHARP OR ABRUPT BREAKS IN THE GRADE. <br />2. APPLY SEED DIRECTLY TO THE PREPARED SOIL PRIOR TO CONCRETE MAT INSTALLATION. USE <br />SEED PER PROJECT SPECIFICATIONS. <br />3. PRIOR TO INSTALLING HEADWALL, ANCHOR TRENCH INITIAL LEADING EDGE OF MAT 18", FILL AND <br />COMPACT ANCHOR TRENCH. INSTALL HEADWALL OVER MAT. <br />4. INSTALL CONCRETE MAT ROLLS. AVAILABLE WIDTHS ARE 5.5', 8', 10', 12', & 16' AVAILABLE IN <br />CUSTOM LENGTHS. A CONCRETE SAW SHALL BE USED TO CUT THE MAT TO EXACT SIZE AND <br />SHAPE. <br />5. APPLICATIONS WHERE OUTFALLS FLOW INTO RETENTION PONDS, EXTEND CONCRETE MAT A <br />MINIMUM OF 3' BELOW LOW WATER ELEVATION. <br />REV: 2/2017 <br />c� <br />CONCRETE MAT <br />ver <br />CONCRETE EROSION MAT <br />OUTLET INSTALLATION DETAIL <br />STANDARD <br />PLATE <br />N0. <br />2513 <br />
The URL can be used to link to this page
Your browser does not support the video tag.