Laserfiche WebLink
City of Elk River Design Standards <br />The flaring of copper tubing ends shall be accomplished only with the use of the proper <br />size and t��pe of tools as designated for the purpose, and will provide accurate sizing and <br />rounding of the ends. Tubing shall be cut squarely and all edge roughness shall be removed <br />prior to flaring. All couplings shall be tightened securely, so the flared end fits snugly- <br />against the be�rel of the fitting without leakage. The flared joint couplings shall be made <br />up without the use of jointing compounds. <br />Unless otherwise indicated, tap service lines shall be installed on a straight line at right <br />angles to the watermain or property- line. The ser�rice line shall be terminated with a curb <br />stop and box at the property line. When the service lines are to be terminated beyond the <br />curb stop and box at the properry line, then the senice line extension shall be terminated <br />with a compression fitting and cap, suitable to pressure test against. This longer ser�rice <br />line may be required to avoid future sidewalk disruption or conflicts with utility lines within <br />the utilit�� easement along the front of the lot line. <br />The service pipe and curb stop coupling depth shall be such as to maintain not less than <br />7.5-foot minimum cover, or in locations where conflict may� occur with storm sewer, <br />service pipe shall be placed at least 3 feet below the storm sewer invert or shall be insulated. <br />The service bo� shall be screwed onto the curb stop coupling and be firmly supported on <br />a concrete block. Service boxes shall be installed plumb and be braced effectively to <br />remain vertical during and after completion of backfilling. The service bo�es shall be <br />brought to final surface grade when the final ground surface has been established. <br />3. Setting Valves, Hvdrants, and Fittin�s <br />H�-drants shall be installed plumb. The large pumper nozzle shall be oriented squarely facing the <br />street. If the hy-drant installation results in the pumper nozzle not facing the street, the hy-drant <br />head shall be rotated accordingly. The traffic flange of the hy�drant shall be set with the bottom <br />of the flange 2 inches above finish grade. When a hy�drant barrel extension is installed the traffic <br />flange shall be adjusted to remain at 2 inches above the finish grade. <br />OO City of Elk River, Minnesota — All rights reserved I 4 <br />