My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2a ERMUSR 01-10-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
01-10-2023 City Council Joint Meeting
>
5.2a ERMUSR 01-10-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:35:57 PM
Creation date
2/15/2023 10:31:14 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5 <br />AIA Document G7091 - 2011 <br />Proposal Request <br />PROJECT: (name and address) <br />108820 Elk River Municipal Utilities - <br />Field Services Building <br />Elk River <br />OWNER: (name and address) <br />Elk River Municipal Utilities <br />1705 Main St. <br />Elk River, MN 55330 <br />CONTRACT INFORMATION: <br />Contract For: Construction Manager at <br />Risk <br />Date: January 12, 2021 <br />ARCHITECT: (natne and address) <br />Kodet Architectural Group Ltd <br />15 Groveland Terrace <br />Minneapolis, MN 55403 <br />Architect's Project Number: Kodet <br />Proposal Request Number: 021 <br />Proposal Request Date: May 27, 2022 <br />CONTRACTOR: (name and address) <br />RJM Construction <br />830 Boone Avenue North <br />Golden Valley, MN 55427 <br />The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to <br />the Contract Documents described herein. The Contractor shall submit this proposal within seven (7) days or notify the <br />Architect in writing of the anticipated date of submission. <br />(Insert a detailed description qfthe proposed modifications to the Contract Documents and, if applicable, attach or reference <br />specific exhibits.) <br />Contractor to provide pricing, including labor and materials, to make the folflowing site changes as noted in the attached <br />narrative from Landform dated May 27, 2022 - see attached CO. 1, C2. 1, C3.1 B, C7.1 & L2. 1. <br />THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE, OR A DIRECTION TO PROCEED WITH THE WORK <br />DESCRIBED IN THE PROPOSED MODIFICATIONS. <br />REQUESTED BY THE ARCHITECT: <br />_In / <br />Edward Daniel Kodet 111, ATA - <br />President <br />PRINTED NAME AND TITLE <br />AJA Document 13709' - 2018 Copyright 1993, 2001 and 2018 by The American Institute of Architects, All rights reserved. The"American Institute of <br />Architects," WA,' the AIA Logo, and WA Contract Documents" are registered trademarks and may riot be used without permission This document woes <br />produced by AIA software at 14:18:41 ET on 05/27/2022 under Order No.6631446434 which expires on 0811312022, is not for resale, is licensed for one-time use <br />only, and may only be used in accordance with the AIA Contract Documents" Terms of Service To report copyright violations, e-inail copyright@aia,org, <br />User Notes: (3F.39ADA55) <br />W, <br />
The URL can be used to link to this page
Your browser does not support the video tag.