Laserfiche WebLink
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5 <br />P'AIA cument G"701 2017 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />109820 Elk River Municipal Utilities - Contract For: Construction Manager at Change Order Number: 006 <br />Field Services Building Risk <br />Elk River Date: January 12, 2021 Date: December 2.2., 2022 <br />OWNER: (Nance and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) <br />Elk River Municipal Utilities Kodet Architectural Group Ltd RJM Construction <br />1705 Main St. 15 Groveland Terrace 830 Boone Avenue North <br />Elk River, MN 55330 Minneapolis, MN 55403 Golden Valley, MN 55427 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert. a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />PCO Owner-42 (Fencing and retaining wall changes) = credit ($19,343.73) <br />Total = credit ($19,343,73) <br />The original Guaranteed Maximum Price was S 12,180,926.00 <br />The net change by previously authorized Change Orders $ 77,744.78 <br />The Guaranteed Maximum Price prior to this Change Order was 12,258,6 0.78 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of _ 19,343.73 <br />The new Guaranteed Maximum Price including this Change Order will be S 12,2.39,32T05 <br />The Contract Time will be unchanged by Zero (0) days. �........._...........ww_ <br />The new date of Substantial Completion will be 8/12/22 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Kodet Architectural Group Ltd RJM Construction Elk River Municipal Utilities <br />( tit )ye) CONTRACTOR (Firm name)FZ" <br />ftnrrd bVy OWNER (Firm name) <br />'rdarrc� ARCHITECT Frlrtr � � M #.A,., <br />SIGNATURE SIGNATURE t''4aIGNATURE <br />Kris Hahn <br />Edward Daniel Kodet Ii1, AiA Mark Hanson <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br />12/22/2022 1/4/202 3 <br />DATE DATE DATE <br />AIA Document G701" — 2017. Copyright Cc7 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The. ' Arerican <br />Institute of Architects," "AIA," the AIA Logo, and 'AIA Contract Documents" are registered U adernarks and may not be used without permission. This document <br />was produced by AIA software at 09:30:35 ET on 12/22/2022 under Order No.2114348185 which expires on 08/13/2023, is not for resale, is licensed for one-time <br />use only, and may only be used in accordance with the AiA Contract Documents" Terms of Service. To report copyright violations, e-mail copyright@aia.org, <br />User Notes: (3139ADA42) <br />