My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.9. - 6.12. SR 11-21-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
11/21/2005
>
6.9. - 6.12. SR 11-21-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:37 AM
Creation date
11/17/2005 4:22:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />....' <br /> <br />..-~ <br /> <br /> <br />-.- <br />I <br /> <br />Schoell & Madson, Inc. <br /> <br />Engineering · Surveying · Planning <br />Soil Testing · Environmental Services <br />.WWW.5choellmadson.com <br /> <br />fllt <br />COP; <br /> <br />August 17, 2005 <br /> <br />Scott Harlicker <br />Senior Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br /> <br />Dear Mr. Harlicker, <br /> <br />Enclosed are the revised plans for Heritage Maples. I apologize for the <br />miscommunication on when you expected these plans back to you for the <br />planning commission meeting. I was hoping to get some feedback from Rebecca <br />regarding the wetland impacts prior to resubmitting revised plans, but I recently <br />learned that we was out of the office until today. <br /> <br />The changes to the plan are very minor. We increased the service road right of <br />way to 60 feet and added a sidewalk to the south side of the service road as <br />requested. In regard to the originally proposed 50-foot right of way, your R-3 <br />zoning does allow the right of ways for the public streets to be reduced to 50 feet. <br />We did not modify the location of any of the units, but we are instead asking for <br />additional setback flexibility as part of the PUD. The setback from the service <br />road will be a side yard setback, so it should not have an impact on the <br />functionality of the project. <br /> <br />The other change that was completed was to the sanitary sewer system. We <br />have revised the southern sanitary sewer connection in order to have all of the <br />manholes located in a paved surface as required by the City. If this is an <br />acceptable solution to this issue, we will make sure that the proposed paved <br />driveway in this location is designed to carry the required weight of the City <br />maintence vehicles. <br /> <br />As part of the wetland permitting, we have proposed it enhance the existing <br />wetland. The wetland is currently a .degraded Type 1 wetland. The existing <br />vegetation is chiefly reed canary grass. We have proposed to eradicate the reed <br />canary grass and replant the wetland with a native wetland seed mix. <br /> <br />Affirmative Action Equal Opportunity Employer <br /> <br />554 Third Street NW, Suite 100, . Elk River, MN 55330 <br />
The URL can be used to link to this page
Your browser does not support the video tag.