Laserfiche WebLink
<br />Heritage Maples <br />September 26, 2005 <br /> <br />Page 5 <br /> <br />. This project will require an NPDES permit and a Storm Water Pollution Prevention <br />Plan (SWPPP). The submittal package included a written text for an SWPPP and an <br />exhibit showing where silt fence and other erosion methods would be utilized. City <br />policy requires that the SWPPP be signed by the owner, the engineer, and the <br />contractor. <br /> <br />. The project currently assumes that construction traffic would enter the site through <br />the West Oaks subdivision. This will likely not be an acceptable route, depending <br />upon how many buildings are constructed and occupied in the West Oaks area. It <br />would seem to be better to have access required along Waco Street through the <br />comer of the Beck property so as not to impact the West Oaks neighborhood. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br />~ <br /> <br />T~~ <br /> <br />City Engineer <br /> <br />s:\PLANNING\Case Files\200S\P 05-16 Heritage Maples\09 26 05 engr's memo.doc <br />