Laserfiche WebLink
<br />to have an inspector at the Facility twenty-four (24) hours a <br />day. These inspectors shall have the right of access to all <br />areas of the Facility, twenty-four (24) hours a day, for the <br />purposes of inspection to ensure compliance with all of the <br />terms and conditions of this License, the conditional use <br />permit for the Facility, and Chapter 58, Article III of the City <br />Code. The on..,site City inspector shall have the right at any <br />time to take one or more of the following actions: <br /> <br />(i) Order a load of MSW inspected, pursuant to the <br />procedures set forth above; <br />(ii) Order the Facility cleaned, if a violation of the dust <br />control plan is observed; or <br />(iii) Order the Facility shut down if necessary to bring it <br />into compliance with the dust control plan or any <br />other term or condition of this License, the <br />conditional use permit for the Facility, or Chapter 58, <br />Article III of the City Code. <br /> <br />9. RDF and Reiect Disposal. All Mixed Municipal Solid Waste not burned, <br />including unburned RDF, RDF process Rejects and RDF Residues, shall <br />be disposed of in strict compliance with the requirements of Chapter 58, <br />Article III of the City Code and Chapter 7035 of Minnesota Rules. <br /> <br />10. RDF Truck Haul Routes. To minimize the impact of the Facility on other <br />land uses and activities in the area, unless otherwise approved or directed <br />by the Building and Environmental Administrator and his/her designees, <br />all RDF hauling trucks transporting RDF from the Facility to the GRE <br />Waste Burning Facility shall use the following routes: (1) from the <br />facility via 165th Avenue to Highway 10 and from Highwa~ 10 directly <br />into the GRE Facility; or (2) from the Facility via 165t Avenue to <br />Highway 10, Highway 10 to Main Street, Main Street to GRE Drive, and <br />from GRE Drive into the GRE Facility; or (3) 165th Avenue to Highway <br />10 to Main Street to Highway 169 into the GRE facility: or (4) from the <br />facility via 16Sth Avenue to Highway 10 to 171 5t Avenue to Twin Lakes <br />Road to Main Street to Highway 169 into the GRE facility. RDF trucks <br />returning from the GRE Facility directly onto Highway 169, Highway 169 <br />to Highway 10, Highway 10 to 165th Avenue, and from 165th Avenue <br />directly into the Facility. Incoming and outgoing traffic from the Facility <br />shall be controlled by the Licensee in such a manner as to provide orderly <br />and safe ingress and egress and so as not to impede or interfere with <br />general traffic. <br /> <br />11. Processing and Storage Areas to be Fully Enclosed. All MSW and RDF <br />receiving, processing, aJ?d storage areas at the Facility shall be fully <br />enclosed. Adequate facilities shall be provided to insure that under no <br /> <br />5 <br />