My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5. SR 11-21-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
11/21/2005
>
7.5. SR 11-21-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:37 AM
Creation date
11/17/2005 3:53:22 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..-.. <br /> <br />Page 2 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />November 9, 2005 <br /> <br />5.2 Review & Consider Health Insurance Costs <br />A task group of staff consisting of two linemen, one water operator, one office employee, <br />Bryan Adams and Theresa Slominski reviewed the health insurance costs for 2006 and <br />prepared a proposal. In developing this proposal, items taken into consideration were the <br />presentation Jodi Berg from the David Martin Agency gave and the feedback from employees <br />resulting from this presentation. Past insurance coverage included single or family plans. <br />Staffhas asked if there could be a single + one coverage option added. Consensus of <br />employees is to keep the A ware Gold plan and pay more out of pocket and also pay a portion <br />of the Principal Dental coverage. Previously the employees paid 23% of the health insurance <br />cost, the new proposal is for the employee to pay 25% with the added option of single + one <br />coverage. This proposal results in an insurance premium cost increase from previous year of <br />approximately 28.4% to the employee and 15% to the employer. <br /> <br />Motion by James Tralle to accept the current Aware Gold insurance plan with the employee <br />paying 25% employee on health and dental insurance coverage. Jerry Takle seconded the <br />motion. John Dietz abstained. Motion carried 2-1. <br /> <br />5.3 Review Cash Flow Proiections <br />Twice annually electric and water financial projections are updated to ensure the <br />necessary financial resources for the future. The updates are done at year end during the <br />budgeting process and after the audit. The electric and water projections reflecting the 2006 <br />budget assumptions were reviewed. Bryan also presented some figures stating that although <br />we have significant reserves, they are still not as high as they should be and we need to look at <br />increasing reserves in the future. James Tralle questioned if there would be significant power <br />cost changes. Bryan responded that power costs will continue to rise along with fuel cost <br />adjustments which usually increase in the summer months. <br /> <br />5.4 Review & Consider 2006 Budget <br />2006 proposed budget was reviewed. Discussion followed regarding the increase in <br />WAC fees, water and electric rates, department needs and projects. Electric and water rate <br />increases will be considered at the December 2005 commission meeting. <br /> <br />5.5 Review & Consider Electrical Cable Bids <br />On October 18, 2005, bids were received for 1000 KCMIL aluminum EPR electrical <br />conductor for the Target Data Center project. The initial Bid request was for 120,000 LF <br />however Target Data Center's recent decision to require only one feeder has changed the <br />amount needed to 70,000 LF instead. Staff recommends accepting the lowest responsive bid <br />from Burmeister Electric Company. <br /> <br />Motion by James Tralle to accept the lowest responsive bidder Burmeister Electric Company <br />for 70,000 LF of 1000 KCMIL EPR electrical cable. John Dietz seconded the motion. <br />Motion carried 3-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.