Laserfiche WebLink
Engineer's Opinion of Probable Construction Cost <br />2040 Northwest Urban Service Areas - Sanitary Sewer System <br />� � isi2ozz <br />(2) Assumed trunk sanitary sewer manholes needed every 400-ft of gravity sewermain. <br />(3) Standby generator included with each lift station. <br />The cost estimate shown above is based on current market conditions and shall be used for preliminary planning purposes only. Market conditions are rapidly <br />changing and unit prices should be updated prior to proceeding with the projects recommended by this study. <br />(1) Assumed open trench installation along existing county roads through the use of easements - easement costs not included. <br />