My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 02-06-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-06-2023
>
8.3 SR 02-06-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:09:32 PM
Creation date
2/3/2023 9:58:45 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4.10 — Preliminary Northwest Lift Station Design�'� <br />Ultimate Initial Firm Ultimate Firm No. Min. Wet Forcemain <br />Peak Pumping Pumping Pumps Forcemain <br />Name Well Diameter <br />Hourly Flow Capacity Capacity (Initial/ Depth (ft) Quantity (inch) <br />(gpm) (gpm) (gpm) Ultimate) <br />Regional 3,300 750 4,000 2 or 3/4 30 2 12 & 16 <br />NW-LS-1 155 200 200 2/2 26 1 6 <br />NW-LS-2 366 425 425 2/2 25 1 6 <br />(1) 2040 firm pumping design capacities and forcemain diameters shall be revised during each lift station's design phase based <br />on tinal development densities. <br />Wastewater pumped by the northwest Regional Lift Station will be sent directly to the City's WWTP which <br />will require the facility to update its receiving structure. This lift station will need at least a single 12-inch <br />forcemain to operate at the recommended initial firm pumping capacity of 750 gpm. Similar to the existing <br />TH 169 Lift Station, the proposed northwest Regional Lift Station can be constructed with enough space to <br />install future pumps. Initially, only two to three pumps will be needed and individual pumping capacities can <br />be increased or new pumps can be added in the future as development progresses. Although parallel <br />forcemains are strongly recommended with long runs of forcemains like this one, the proposed parallel 16- <br />inch forcemain will not be needed until approximately the 2050-2060 timeframe. Therefore, the City could <br />choose not to install the 16-inch forcemain until later. However, for the purpose of budgetary planning, the <br />cost estimate for the northwest study areas includes the construction of the 16-inch forcemain at this time. <br />A proposed layout for both forcemains along the railroad corridor is shown in Figure A22 in Appendix A. <br />A high-level ultimate sanitary sewer layout for the northwest areas beyond 2040 is shown in Figure A23 in <br />Appendix A. <br />Feasibility Report <br />Northeast & Northwest Urban Service Area Expansion Study <br />City of Elk River, MN <br />WSB Project No. 020010-000 <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.