My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 02-06-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
02-06-2023
>
8.3 SR 02-06-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:09:32 PM
Creation date
2/3/2023 9:58:45 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 <br />2.0 <br />0 <br />C� <br />� <br />� 1.5 <br />� <br />� <br />E <br />� <br />0 1.0 <br />L <br />� <br />� <br />� <br />0.5 <br />0.0 <br />2022 <br />Figure 3.5 — Northwest Study Areas Water Supply Capacity Evaluation <br />The water treatment capacity evaluation for the northwest study areas is depicted in Figure 3.6. The <br />northwest areas will immediately have treated water available through the booster stations. It is strongly <br />recommended that groundwater pumped by future wells in the northwest study areas is treated on-site with <br />pressure filtration facilities. <br />2.5 <br />2.0 <br />0 <br />C� <br />� <br />� 1.5 <br />� <br />c� <br />� <br />a� <br />0 1.0 <br />L <br />� <br />� <br />� 0.5 <br />0.0 <br />2022 <br />_ ,Firm Treatment Capacity Projected Maximum Day Demand <br />Figure 3.6 — Northwest Study Areas Water Treatment Capacity Evaluation <br />A water storage capacity analysis was completed for the northwest areas following the same method used <br />in Section 3.4 of this report. A summary off this analysis for the northwest areas is shown in Table 3.12 and <br />depicted in Figure 3.7. Given the requirements shown below, it is recommended to construct at least a 1.0 <br />MG water tower within a five (5) year timeframe to serve the northwest study areas. <br />Feasibility Report <br />Northeast & Northwest Urban Service Area Expansion Study <br />City of Elk River, MN <br />WSB Project No. 020010-000 <br />Page 11 <br />2024 2026 2028 2030 2032 2034 2036 2038 2040 <br />Date (yyyy) <br />Firm Pumping Capacity Projected Maximum Day Demand <br />2024 2026 2028 2030 2032 2034 2036 2038 2040 <br />Date (vwv) <br />
The URL can be used to link to this page
Your browser does not support the video tag.