Laserfiche WebLink
F��� ���FR <br />STORM <br />Bauer Services II INC <br />ELKRIVER <br />DESCRIPTION <br />1. Haul debris - per pickup truck load - <br />including dump fees <br />2. Taxes, insurance, permits & fees <br />(Bid Item) <br />3. Masonry (Bid Item) <br />Total: ELKRIVER <br />Line item Totals: ELKRiVER <br />QTY <br />1.00 EA <br />1.00 EA <br />1.00 EA <br />ELKRiVER <br />REMOVE <br />201.46 <br />0.00 <br />0.00 <br />REPLACE <br />0.00 <br />250.00 <br />14,680.00 <br />TAX <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O&P <br />40.30 <br />50.00 <br />2,936.00 <br />3,026.30 <br />3,026.30 <br />TOTAL <br />241.76 <br />300.00 <br />17,616.00 <br />18,1 _57.76 <br />18,157.76 <br />ELKRIVER 1/29/2023 Page:2 <br />