Laserfiche WebLink
Standard of Service Design storage infrastructure to provide 3,500 gpm for a period of 3 hours•Design firm pumping and treatment capacities to meet maximum day demands•Maintain water <br /> velocities below 5 fps•Maintain water pressure between 50 and 80 psi and not less than 35 psi•Sections 3.4 through 3.7 of report Water Distribution System– <br />