My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10 SR 01-03-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
01-03-2023
>
5.10 SR 01-03-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 9:15:33 AM
Creation date
12/30/2022 9:13:58 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Collection Service for Bulky Items and large items must have prior <br />arrangements made between the Contractor and resident for collection. The <br />prices to be charged to residents for these Collection Services shall be as set <br />forth by the Contractor. These charges will be billed directly from the <br />Contractor to the resident. <br />3) Excess Recycling Collection: The Contractor shall collect excess recycling provided <br />that it is stored in paper bags, or, in the case of cardboard, it is flattened and bundled <br />neatly with twine, is no larger than 3 foot by 3-foot bundles and placed adjacent to <br />the recycling cart. <br />J• Garbage and recycling containers will be dropped off at new accounts by the <br />Contractor within three (3) business days of notification by the City. Such <br />notification must be in email form. <br />k. The Contractor sha11 deliver all Garbage it collects under this Agreement to the Elk <br />River Landfill (ERL), unless otherwise directed by the City, Sherburne County or <br />ERL. If a Contractor is directed by City to a Facility other than the ERL, the <br />Contractor shall be credited $1.00 per mile by the City for the round-trip mileage <br />between the ERL and the back-up Facility. For sites other than ERL, Republic will bill <br />the City of Elk River. <br />Unless otherwise directed by City, Contractor shall, upon delivery of Garbage to the <br />ERL or other designated Facility, give the Facility operator a load report on a form <br />acceptable to Sherburne County that provides information concerning tlie load as may <br />be required by the County. T'he Contractor shall also provide the City, on a monthly <br />basis, with receipts showing the weight of Garbage delivered to the ERL under this <br />Agreement, or any other Facility to which Garbage collected under this Agreement is <br />delivered. <br />m. The Contractor shall not knowingly deliver any Unacceptable Waste to a Facility, nor <br />shall the Contractor mix any Unacceptable Waste with Garbage collected under this <br />Agreement. If the Contractor is uncertain whether certain waste is Unacceptable <br />Waste, Contractor may request a determination from the Facility by submitting a"Pre- <br />Delivery Waste Evaluation" request in accordance with procedures established by <br />Sherburne County. <br />n. If a Facility has a reasonable basis to believe that Garbage delivered by the Contractor <br />contains Hazardous Waste or other Unacceptable Waste, the Facility operator may <br />require the Contractor, at Contractor's expense, to recover and properly manage or <br />dispose of waste deposited which contains Hazardous Waste or Unacceptable Waste. <br />City is to make every effort to assist in cost recovery if the source of the rejected <br />material is identified. In the event Garbage is rejected by the Facility, and the <br />Contractor disagrees with a decision by the Facility to reject a load of Garbage, the <br />Contractor shall have the right to present information to the County, the Facility, and <br />5 <br />zziizz�z <br />
The URL can be used to link to this page
Your browser does not support the video tag.