My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j ERMUSR 12-13-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
12-13-2022
>
6.1j ERMUSR 12-13-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:37:51 PM
Creation date
12/19/2022 4:01:30 PM
Metadata
Fields
Template:
City Government
date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Dave Ninow —Water Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />December 13, 2022 <br />6.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Delivered 10 new water meters, sealed the meter, installed an encoder receiver <br />transmitter, and took curb stop ties. <br />• Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br />• Completed 20 routine fluoride samples <br />o All samples met MDH standards <br />o Submitted MDH Fluoride Report <br />• Submitted Discharge Monitoring Report (DMR) for the Diesel Generation Plant to the <br />Minnesota Pollution Control Agency. <br />• The pump, motor, and drop pipe have been removed from Well #2 for routine <br />maintenance and inspection. <br />• The water operators have started annual maintenance of the water treatment plants. <br />This process includes inspecting and recharging the iron and manganese removal <br />pressure filters. <br />• We have once again placed protective plastic bags on fire hydrants along high traffic <br />roads to protect them from corrosion from road salt. <br />• All Water Department field staff members have completed backflow device testing <br />certification. Having staff certified to test devices is part of ERMU's updated backflow <br />prevention policy. <br />• Staff has been moving and organizing tools, equipment, and materials from the old field <br />services building to the new building. <br />ATTACHMENTS: <br />• November 2022 Pumping by Well <br />Page 1 of 1 <br />172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.