My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1 SR 12-19-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
12-19-2022
>
9.1 SR 12-19-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 9:34:29 AM
Creation date
12/15/2022 10:23:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />River <br />To <br />Mayor and City Council <br />Agenda Section Meeting Date <br />Work Session December 19, 2022 <br />Item Description <br />Concept Review: 55+ Apartment Building at <br />17355 Fillmore Street, Garnet Novotny <br />Request for Action <br />Item Number <br />9.1 <br />Prepared by <br />Chris Leeseberg, Senior Planner <br />Reviewed by <br />Zack Carlton, Community Development Director <br />Reviewed by <br />Cal Portner, City Administrator <br />Action Requested <br />Provide the applicant with informal, non -binding, feedback regarding their proposed development project. <br />Background/Discussion <br />Case No. CR 22-06 <br />The applicant has submitted a concept sketch for a senior 55+ <br />apartment building on two 35-acre parcels. The site is zoned for 2.5- <br />acre residential lots and is outside the Urban Service District. A majority <br />of the eastern parcel is encumbered by wetlands and the southeast <br />corner of the western lot has some wetland. <br />The proposal shows an L-shaped apartment structure with parking and <br />a circular drive lane, trails and boardwalks through upland and wedand <br />areas, and sport courts. <br />The Site Plan Review generated the following comments: <br />■ A traffic study would need to be completed. <br />■ Sewer and water would need to be extended. This will also require <br />an amendment to the Comprehensive Plan, expanding the urban <br />V <br />service boundary. y <br />■ Three-phase electric power would be required for a project of this <br />size. The power demands will require expanding the current service. <br />■ The closest water main available for connection to city water service <br />is over 1,000 feet away. Water main facilities will need to be Figure i <br />extended from the trunk system or water distribution system. <br />■ Approximately 1,300 feet of urban city street would need to be constructed from the intersection of 175t1' <br />Avenue and Fillmore Street. <br />■ Park dedication at a per unit cost, not to exceed $500,000 for high -density residential. This assumes park <br />dedication will be satisfied with cash. <br />These requirements would be at the developer's cost. <br />The Elk River Vision J�AYUPE <br />A n eltioming community avith revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity. Updated. August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.