Laserfiche WebLink
33i(;3s <br />includes individual homebuilding sites to control erasion into sags <br />and storm Sower$. <br />The clearing of all City streets within one-half (112) mile of the <br />Subdivision at least once per week, and more often if directed by the <br />City agincer. <br />The clearing of all on -site and au down -gradient off -site City storm <br />sewers if determined necessary by the City Engineer because of erosion <br />from building sites within the Subdivision. <br />(01) Building Permits - City will not issue any building permit for any lot or <br />parcel in the Subdivision until all roads necessary to access the lot are complete to the <br />point of having the first layer of asphalt paving in place, except that- <br />(1) building permits will be issued if all roads necessary for access to the <br />lot are graded, gravel subbase and base have been installed and <br />approved by the City Engineer, and are ready for bituminous surfacing, <br />and Developer enters into a Road Maintenance Agreement with City in <br />the form attached as Exhibit D to this Agreement for snowplowing and <br />maintenance of roads until acceptance of the Improvements by the City; <br />and <br />(H) issuance of a building permit may be authorized by the Building and <br />Zoning Administrator for one or more model homes prior to the <br />graveling of roads if the City Engineer determines, with respect to each <br />lot. that alternative access to that lot is available and is sufficient to <br />allow construction to proceed. ,any model home constructed pursuant <br />to early issuance of a building permit may not be open to the public as <br />a model until all roads necessary to access the home have been graded, <br />gravel subbase and base have been installed and approved by the City <br />Engineer, and are ready for bituminous surfacing. <br />(02) t a p - City will not issue a certificate of occupancy for any <br />building constructed on any lot or parcel in the Subdivision until all Improvements are <br />completed, approved by the City Engineer and accepted by the City, except that: <br />(i a certificate of occupancy will be issued where all Improvements have <br />been completed except the final layer of asphalt paving; and <br />issuance of a certificate of ocanpuzcy can be authorized by the Building <br />and Zoning Administrator prior to the acceptance of the Improvements <br />if the City Engineer deterrnirnes that all roads necessary to access the <br />home am graded, gravel subbase and base have been installed and <br />Pn IZLi13 7 <br />