Laserfiche WebLink
Capital Improvement Plan 2023 th,u 2027 <br />City of Elk River, Minnesota <br />Project # PM-01 <br />Project name Pavement Management -Streets <br />Department <br />Infrastructure Improvements <br />Contact <br />Public Works Director <br />Type <br />Improvement <br />Useful Life <br />25 years <br />Category <br />Street Construction <br />Description I <br />?reventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects. <br />Street improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed <br />;very other year. <br />Justification I <br />ndividual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street <br />segment. These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are <br />mplemented, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. <br />Expenditures <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />Total <br />Design <br />100,000 <br />100,000 <br />200,000 <br />Construction <br />3,700,000 <br />3,500,000 <br />3,000,000 <br />10,200,000 <br />Maintenance <br />200,000 <br />200,000 <br />200,000 <br />200,000 <br />800,000 <br />Total <br />3,900,000 <br />300,000 <br />3,700,000 <br />300,000 <br />3,000,000 <br />11,200,000 <br />Funding Sources <br />2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />Total <br />Pavement Management <br />3,850,000 <br />300,000 <br />3,600,000 <br />300,000 <br />3,000,000 <br />11,050,000 <br />Storm Water <br />50,000 <br />100,000 <br />150,000 <br />Total <br />3,900,000 <br />300,000 <br />3,700,000 <br />300,000 <br />3,000,000 <br />11,200,000 <br />2023-2027 CAPITAL IMPROVEMENT PLAN <br />56 <br />