My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. PCSR 11-22-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
11-22-2022
>
4.3. PCSR 11-22-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 10:27:40 AM
Creation date
11/17/2022 10:26:19 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phone: 763.635.1000 <br /> <br />www.ElkRiverMN.gov <br /> <br />November 15, 2022 <br /> <br />Paul Braton VIA EMAIL: paulbraton@rochoncorp.com <br />28 2nd Street NW #200 ryankostreba@msn.com <br />Osseo, MN 55369 <br /> <br />RE: Conditional Use Permit Application Complete <br /> <br />Dear Mr. Braton: <br /> <br />Thank you for your application for a Conditional Use Permit (CUP) to operate a 3-level climate- <br />controlled storage facility at 19645 Evans Street NW. I will be reviewing your application and <br />preparing the staff report for the Planning Commission and City Council. <br /> <br />On October 25, 2022, the city received your application for the above use. Per Minnesota State <br />Statute §15.99, the city is required to make a decision within 60 days of receipt of the completed <br />application. Subd. 3 of that section requires the city to notify an applicant within 15 business days if <br />information is missing, delaying the start of the 60-day review period. A city may extend the 60-day <br />review period up to 120 days to complete the review. <br /> <br />With the receipt of the required materials on October 25, 2022, the application for a CUP has been <br />deemed complete, and the 60-day review period starts. This application has been assigned Case <br />Number CU 22-24 and is scheduled to be reviewed by the Planning Commission on November 22, <br />2022, at 6:30 p.m. at the Elk River City Hall, 13065 Orono Parkway. With a Planning Commission <br />recommendation on that date, the City Council will review your application no earlier than <br />December 19, 2022. <br /> <br />Staff conducted a thorough site plan review on November 7, 2022, and has the following comments: <br /> <br />Land Use <br /> The establishment of a commercial PUD on this property also requires and land use <br />amendment, changing the Comprehensive Plan guidance to Highway Commercial. Staff <br />included the land use amendment with the public hearing notice, and it has been assigned <br />Case No. LU 22-04 <br /> <br />ERMU <br /> The drainage pond needs to be moved out of the utility easement. ERMU has a main three- <br />phase feeder line and a three-phase underground distribution line going North and South <br />along the West side and going East along the North and South of this parcel.
The URL can be used to link to this page
Your browser does not support the video tag.