My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 11-8-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
11-08-2022 SPECIAL MTG
>
6.1g ERMUSR 11-8-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:39:34 PM
Creation date
11/8/2022 12:51:43 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Thomas Geiser— Operations Director <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />November 8, 2022 <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Staff has been attending meetings with Sherburne County to plan for the County Road <br />44 project. <br />• Working on 2023 Budget items. <br />• We are still having issues with the fuse pads we received which were incorrectly <br />assembled. The problem is that there are some loose parts, and the nuts and bolts are <br />deteriorating. Irby Utilities is helping to facilitate a resolution to this issue. The vendor <br />who sold the pads is currently fixing eight of the twelve we received. <br />• We received our Ford F550, and it is currently at Towmaster Trailers in Litchfield getting <br />the dump box installed. <br />• We have been having some issues with the power take -offs on bucket truck 5 and 11. <br />We are working with Altec and Freightliner to resolve those. <br />• Staff has started installing underground primary/transformers for the apartments being <br />built at Highways 10 and 169. <br />• Working on getting an additional feeder from Station 14 Bank 4 to Otsego for future <br />support. This project will extend into spring of 2023. <br />• Still attending weekly Highway 169 Redefine project meetings. Everything is going well <br />at this point. <br />• Working with Waste Management and Parson's Electric on power needs for their <br />service upgrade. <br />Page 1 of 1 <br />162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.